
Setup and Operation
Site Preparation
Setup and Operation
doc011422
3-1
3
SECTION 3 SETUP AND OPERATION
3.1 Site Preparation
An outside source of compressed air adjustable from 80-120 psi (5.6-8.4 Kg/cm) is
required.
WARNING!
Have a certified electrician install the power to your
machine. Failure to do so may result in death or serious injury.
WARNING!
Be sure the power supply cables are not a trip hazard.
Failure to do so may result in death or serious injury.
CAUTION!
Improper voltage will cause damage to the motor and
electronic components. Have a qualified electrician install the
power supply to begin using your pallet dismantler.
IMPORTANT!
The power supply must meet the motor specifica
-
tions concerning wire size, fused disconnect, and voltage, which
are provided in the motor’s manual. The electrical installation must
also meet local codes.
IMPORTANT!
Ensure the blade spins in the proper direction. If not,
have the electrician change the engine rotation.
3.2 Onsite setup
DANGER!
Maintain a clean and clear path for all necessary move
-
ment around the pallet dismantler and stacking areas. Failure to do
so will result in death or serious injury.
WARNING!
Do not allow children in the area of the pallet disman
-
tler. Failure to do so may result in death or serious injury.
WARNING!
Do not set up the pallet dismantler on ground with
more than a 10 degree incline. Failure to do so may result in death
or serious injury.
FOR GAS ENGINES
DANGER!
Do not operate this unit indoors or in an enclosed area;
carbon monoxide poisoning will occur. Failure to do so will result in
death or serious injury.