SETUP & OPERATION
Moulder Setup
Operation
EGdoc042320
4-4
4
See Figure 4-1.
4.
Repeat the bed rail adjustment with the string at the other side of the moulder frame.
5.
Move the head until it is positioned over the bed rail.
6.
Measure the distance from the cutter to the bed rail in the places shown below. The dimensions A
and B should be the same.
FIG. 4-1
Equal height
object
Measure distance
between string
and bed rails
Equal height
object
String across
bed rails
Содержание MP100 E5S
Страница 1: ......
Страница 2: ......
Страница 47: ...SETUP OPERATION Moulder Setup Operation EGdoc042320 4 2 4 1ph 230 VAC UL 70 A class J 7 AWG 10mm2 TABLE 4 1 ...