![Wood-mizer MP100 E5S Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/wood-mizer/mp100-e5s/mp100-e5s_user-manual_994606008.webp)
INTRODUCTION
Machine and Site Preparation
1
1-2
15doc042320
INTRODUCTION
1.2
Machine and Site Preparation
The Wood-Mizer moulder is delivered on a pallet. Due to the weight, it has to be
transported with auxiliary carrier equipment and in accordance with general safety rules.
The moulder must be installed in the work-place as instructed in the operator’s manual.
To ensure safe operation of the machine, the work-place dimensions should be
3 m x 10 m. If your machine is equipped with additional bed sections, prepare an
appropriately larger work area. The work-place must be protected from rain and snow.
1.3
The major components of the moulder
FIG. 1-0 MP100
WMM053B
Moulding Head
Feed Crank
Electric Box with
Operator Panel
Safety Handle
(CE Version only)
Head Height
Scale
Содержание MP100 E5S
Страница 1: ......
Страница 2: ......
Страница 47: ...SETUP OPERATION Moulder Setup Operation EGdoc042320 4 2 4 1ph 230 VAC UL 70 A class J 7 AWG 10mm2 TABLE 4 1 ...