SETUP & OPERATION
Moulder Setup
4
4-1
EGdoc042320
Operation
SECTION 4 SETUP & OPERATION
4.1
Moulder Setup
IMPORTANT!
Before starting to use the moulder, you have to meet
the following conditions:
Set up the moulder on firm, level ground and level the moulder frame. Secure the moulder to
the ground to prevent moving during operation. A concrete foundation or pads and
anchored bolts are recommended.
The moulder should not be operated outdoors when it is raining/snowing and in case of
rain/snow, the machine must be stored under roof or indoors.
The moulder should always be operated with the sawdust collection system.
The moulder should be operated in temperature range from -15
o
C to 40
o
C (5
o
F to 104
o
F)
only.
The illumination at the operator's position should be at least 300lx
1
.
The moulder operator’s position is shown below.
Have a qualified electrician install the power supply (according to EN 60204 Standard).
The power supply must meet the specifications given in the table below.
1. The light source can not cause stroboscopic effect.
Voltage
Fuse disconnect
Suggested Wire Size
3ph 400 VAC
10 A
13 AWG/2,5 mm
2
to 15m/49 ft length
3ph 230 VAC
20 A
13 AWG/2,5 mm
2
to 15m/ 49 ft length
3ph 460 VAC UL
15 A class J
11 AWG / 4mm
2
TABLE 4-1
!
wmm010a