![Wood-mizer A/DH5 Скачать руководство пользователя страница 87](http://html1.mh-extra.com/html/wood-mizer/a-dh5/a-dh5_safety-setup-operation-and-maintenance-manual_994631087.webp)
f:\polish\manuals\forms\503
20doc111517
WOOD-MIZER LT20 SERIES MAINTENANCE LOG
(Check motor/engine and option manuals for additional maintenance procedures)
PROCEDURE
MANUAL
REFERENCE
TOTAL HOURS OF OPERATION
FILL IN THE DATE AND THE MACHINE HOURS AS YOU PERFORM EACH PROCEDURE.
A SHADED BOX INDICATES MAINTENANCE IS NOT NEEDED AT THIS TIME.
50 HRS
100 HRS
150 HRS
200 HRS
25O HRS
300 HRS
350 HRS
400 HRS
450 HRS
500 HRS
Clean And Lubricate Vertical Mast Rails.
Lubricate Pivot Points/Chains.
Check Tensions Of Belts.
Check Blade Wheel Belts For Wear.
See Section 3.8
See Section 3.9
Check Tensions Of Up/Down And Power Feed Chains.
Lubricate Blade Tensioner Handle And Rods.
Содержание A/DH5
Страница 1: ...Table of Contents Section Page Table of Contents SW 07doc1115171...
Страница 2: ......
Страница 41: ...SETUP OPERATION Sawmills with cable guide SETUP OPERATION doc111517 2 7 2 FIG 2 4 LT40MRC K 7 B5 1 B0 18...
Страница 86: ...1 18 30doc111517...