10
IOiK/BS/UniPro/04/2020/ID-98589
Technical description
Operating and Maintenance Manual
– Sectional garage door UniPro
EN
III. DOOR ACCEPTANCE / HANDOVER PROTOCOL
The specified door’s technical condition and safety complies with the standards and directives listed in the technical documentation of the door.
Acceptance tests of the entire door should be performed by experienced and qualified personnel. The responsibility to perform the
required tests must is borne by the said personnel. Depending on the existing risk, compliance with the requirements of any appli-
cable laws, standards and other regulations, in particular EN 13241-1, has to be checked.
III.I. THE TEST RUN OF THE PRODUCT WAS PERFORMED WITHOUT ISSUES AND IN ACCORDANCE WITH THE REQUIREMENTS
• with complete and ready fitting and with all the electrotechnical and mechanical components properly adjusted
• with a temporary power supply, but with all the electrotechnical and mechanical components properly adjusted
III.II. THE TEST RUN COULD NOT BE PERFORMED DURING PRODUCT ACCEPTANCE BECAUSE OF
• the lack of power supply
• defects and errors
• other reasons beyond the control of the fitter
(1) (2)
town
date
.....................................................................................................................................................................................................................................................................................
town
date
.....................................................................................................................................................................................................................................................................................
signature of product owner
(ordering party)
fitter’s signature
and fitting company stamp
.....................................................................................................................................................................................................................................................................................
signature of product owner
(ordering party)
fitter’s signature
and fitting company stamp
.....................................................................................................................................................................................................................................................................................
III.III. THE TEST RUN OF THE PRODUCT WILL BE SCHEDULED AND PERFORMED AT THE EXPENSE AND INITIATIVE OF THE PRODUCT OWN-
ER / FITTING COMPANY
III.IV. THE TEST RUN OF THE PRODUCT WAS PERFORMED WITHOUT ISSUES AND IN ACCORDANCE WITH THE REQUIREMENTS
I declare that:
• I hereby accept the warranty terms and conditions and confirm acceptance of the complete product and the Operating and Maintenance Manual.
• I was informed about the proper procedure of operating the product, I read and understood the conditions of use, operation and maintenance
(1)
– write “X” where marked with
, please write legibly
(2)
– delete as appropriate