background image

1) 소각로/보일러 스케일 청소 (Cleaning the scale of boiler/Incinerator)

2) 보일러 청소완료후 재급수 요령

14

청소 완료후 보일러에 재급수를 할때 다단펌프는 반드시 수동위치에 놓
고 싸이클론 수위를 확인 하면서 급수를 한다-싸이클론의 수위가 올라가
면 스타트를 누르고 싸이클론 수위가 내려가며 스톱을 눌러 수동으로 보
일러에 물을 채운다.

When you resupply water after cleaning, please set the pump on
manual and supply water while checking the water level in cyclone.
When the water level increases in cyclone, press start button. When
the water level decreases in cyclone, press stop button and supply
water into the boiler by manual.

(싸이클론에 물이 없는 상태에서 자동으로 펌프를 돌리게 되면 펌프에 공
기가 차서 고장의 원인이 됨)(It is one of reason for the breakdown if

you operate pump automatically without water in cyclone since the
air comes into the pump.)

이때 레벨게이지의 밸브를 열어서 공기가 빠지도록 하며, 물이 넘치면 밸
브를 잠근다.

At this time, please open the level gauge valve to deflate. And close
the valve when water overflows.

5. 점검 및 청소 방법 (How to inspect and clean)

월간 점검 사항 (Monthly check point)

소각로

 

Incinerator 

물이

 

넘칠때까지

 

열어둔다

 

Please open until water overflow 

보일러

 

하부

 

The bottom                 

of boiler 

가동

 

Start 

펌프

 

재가동시

 

공기를

 

뺀다

 

Deflate air when   

you reoperate pump

 

정지

 

Stop 

Содержание WT-2500-4000

Страница 1: ...HEAD OFFICE FACTORY 22 NOKSANSANDAN 361 RO SONGJUNG DONG GANGSEO GU BUSAN KOREA TEL 82 51 831 0962 3 HOMEPAGE www perfectboiler co kr Separable Incineration Steam Boiler User s Manual...

Страница 2: ...2 3 4 5 6 7 1 8 A S 9 1 1 PVC 10...

Страница 3: ...ity of the problem caused by renovation of pipe and electronic devices without notice Be careful of burning body since the main body and pipes are running on a high temperature The operator should wea...

Страница 4: ...1 The name of each part 2 Check point before operation 3 How to use Control Panel 4 How to operate Boiler 5 How to inspect and clean 5 6 7 8 9 10 11 15 CONTENTS 1 2 3 4...

Страница 5: ...Ash Outlet Door 3 Level Guage Drain Valve 4 Boiler Drain Valve 5 Level Gauge Mcdonnell 6 Boiler Overheat Prevention Sensor 7 Waste Inlet Door 8 2 2nd Chamber Clean Door 9 2 2nd Combustion Chamber Ther...

Страница 6: ...SCRIPTION REMARK 15 Incinerator Water Supply Tank 16 Safety V V 17 SOLENOID V V Water Supply 18 Multistage Pump 19 Exhaust Fan 20 Chimney Clean Door 21 Cyclone Ash Clean Door 22 Pressure Switch 23 SOL...

Страница 7: ...e remained ashes after burning At this moment rake out the hard ashes on the bottom of wall surface as much as possible Please drain the water until the warning light and buzzer is operating by openin...

Страница 8: ...ing together 4 After draining the water from the incinerator please check that the water is properly supplied into the tank and the boiler compound is also put inside 2 Check point before operation Pr...

Страница 9: ...5 The display and the name of switch 3 How to use Control Panel 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25...

Страница 10: ...6 3 How to use Control Panel 1 2 3 ITEM NO DESCRIPTION REMARK 1 2 3 4 5 SOLENOID V V 6 OFF 7 8 A B 9 ON 10 ON 11 12 13 14 7 15 16 17 18 19 20 21 1 2 22 2 23 3 24 25 180...

Страница 11: ...nother when you repair or clean 9 Tower lamp on off switch Turn on while operating 10 Buzzer on off switch The alarm will be operated in case it is overheated and in low water level Turn on while oper...

Страница 12: ...e sure that you have put reasonable quantities inside and it has been buried in places because if you oversupply the waste will not get fire on the bottom So it is going be finished as incomplete comb...

Страница 13: ...the required steam pressure please slowly open the main steam valve In case of being the steam header please open the main steam valve on the top of boiler and control the valve of steam header 450 8...

Страница 14: ...e valve and blow down in the state of pressure dropped If the blower stops in the state which has not completely burned The combustion nozzle will be blocked it is possible to generate exhaust 4 How t...

Страница 15: ...weekly and inside combustion chamber the ashes from the surface of a wall When you clean the nozzle please use the driver and push to the end as below picture whether to check the holes are blocked or...

Страница 16: ...automatic injection device If not please fill in again When you drain while daily inspection please check more than once a week whether precipitate and solid are settled or not by filling the drained...

Страница 17: ...to the bottom and check there is scale 8 Since the boiler has been heated you have to drain after 8 hours later in the state of complete combustion Monthly check point 5 How to inspect and clean 13 L...

Страница 18: ...es in cyclone press stop button and supply water into the boiler by manual It is one of reason for the breakdown if you operate pump automatically without water in cyclone since the air comes into the...

Страница 19: ...boiler 15 Please open the front and back door Clean soot and dust on the pipe by using cleaning equipment which is provided At this time it is more effective if you use air compressor Monthly check po...

Отзывы: