background image

2. The boiler should be installed on the flat ground and separated space.

3. Use the designated waste only

4.The prohibition of renovation and arbitrary operation

5. Safety management

6. Water quality management

7. 1st electricity and water supply

Caution

1.  Please appoint someone in charge of management before using the boiler. Make them
acquaint with this manual and start operating and managing the boiler.

9. We guarantee 1 year of quality free of charge after installation. However, the user takes
responsibilities itself caused by its mistake and carelessness within the term of guarantee.

The fuel of incineration boiler is flammable waste. It is the cause of generating
smoke and clogging combustion nozzle in case of incinerating the metal, flame

retarding waste(PVC, etc), flam proof fabric and non-flammable waste. Don’t put

explosive materials(Butane gas can, oil, lighter) into the boiler since it could
explode. Also the wet waste should be put after drying.

The manufacturer doesn’t have responsibility of the problem caused by renovation

of pipe and electronic devices without notice.

 Be careful of burning body since the main body and pipes are running on a high
temperature. The operator should wear the protective mask and gloves, install a fire
extinguisher in boiler room.

Tap water or ground water which is used for the boiler is including all sorts of
impurities. In case of a steam boiler, these impurities will be piled up. It causes
scale and corrosion of boiler, making the boiler stop, shorten the lifetime and
decline the efficiency. Therefore, please make sure how to clean and inspect the
boiler, and receive routine maintenance from cleaning company of boiler water
treatment.

The allowable error is within ±10% about main electronic voltage which is supplied

into the boiler.
If it exceeds this figure or it is unstable, the motor and electronic component can be
damaged so that you should install the automatic voltage control device.
Also, the water should be supplied as much as the amount of steam used. If the
water is less than used steam, please install water supply motor.

8. Please consult with the agent or A/S team of head office in case of occurring the
problem and breakdown.

Warning

 

Содержание WT-2500-4000

Страница 1: ...HEAD OFFICE FACTORY 22 NOKSANSANDAN 361 RO SONGJUNG DONG GANGSEO GU BUSAN KOREA TEL 82 51 831 0962 3 HOMEPAGE www perfectboiler co kr Separable Incineration Steam Boiler User s Manual...

Страница 2: ...2 3 4 5 6 7 1 8 A S 9 1 1 PVC 10...

Страница 3: ...ity of the problem caused by renovation of pipe and electronic devices without notice Be careful of burning body since the main body and pipes are running on a high temperature The operator should wea...

Страница 4: ...1 The name of each part 2 Check point before operation 3 How to use Control Panel 4 How to operate Boiler 5 How to inspect and clean 5 6 7 8 9 10 11 15 CONTENTS 1 2 3 4...

Страница 5: ...Ash Outlet Door 3 Level Guage Drain Valve 4 Boiler Drain Valve 5 Level Gauge Mcdonnell 6 Boiler Overheat Prevention Sensor 7 Waste Inlet Door 8 2 2nd Chamber Clean Door 9 2 2nd Combustion Chamber Ther...

Страница 6: ...SCRIPTION REMARK 15 Incinerator Water Supply Tank 16 Safety V V 17 SOLENOID V V Water Supply 18 Multistage Pump 19 Exhaust Fan 20 Chimney Clean Door 21 Cyclone Ash Clean Door 22 Pressure Switch 23 SOL...

Страница 7: ...e remained ashes after burning At this moment rake out the hard ashes on the bottom of wall surface as much as possible Please drain the water until the warning light and buzzer is operating by openin...

Страница 8: ...ing together 4 After draining the water from the incinerator please check that the water is properly supplied into the tank and the boiler compound is also put inside 2 Check point before operation Pr...

Страница 9: ...5 The display and the name of switch 3 How to use Control Panel 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25...

Страница 10: ...6 3 How to use Control Panel 1 2 3 ITEM NO DESCRIPTION REMARK 1 2 3 4 5 SOLENOID V V 6 OFF 7 8 A B 9 ON 10 ON 11 12 13 14 7 15 16 17 18 19 20 21 1 2 22 2 23 3 24 25 180...

Страница 11: ...nother when you repair or clean 9 Tower lamp on off switch Turn on while operating 10 Buzzer on off switch The alarm will be operated in case it is overheated and in low water level Turn on while oper...

Страница 12: ...e sure that you have put reasonable quantities inside and it has been buried in places because if you oversupply the waste will not get fire on the bottom So it is going be finished as incomplete comb...

Страница 13: ...the required steam pressure please slowly open the main steam valve In case of being the steam header please open the main steam valve on the top of boiler and control the valve of steam header 450 8...

Страница 14: ...e valve and blow down in the state of pressure dropped If the blower stops in the state which has not completely burned The combustion nozzle will be blocked it is possible to generate exhaust 4 How t...

Страница 15: ...weekly and inside combustion chamber the ashes from the surface of a wall When you clean the nozzle please use the driver and push to the end as below picture whether to check the holes are blocked or...

Страница 16: ...automatic injection device If not please fill in again When you drain while daily inspection please check more than once a week whether precipitate and solid are settled or not by filling the drained...

Страница 17: ...to the bottom and check there is scale 8 Since the boiler has been heated you have to drain after 8 hours later in the state of complete combustion Monthly check point 5 How to inspect and clean 13 L...

Страница 18: ...es in cyclone press stop button and supply water into the boiler by manual It is one of reason for the breakdown if you operate pump automatically without water in cyclone since the air comes into the...

Страница 19: ...boiler 15 Please open the front and back door Clean soot and dust on the pipe by using cleaning equipment which is provided At this time it is more effective if you use air compressor Monthly check po...

Отзывы: