2. The boiler should be installed on the flat ground and separated space.
3. Use the designated waste only
4.The prohibition of renovation and arbitrary operation
5. Safety management
6. Water quality management
7. 1st electricity and water supply
Caution
1. Please appoint someone in charge of management before using the boiler. Make them
acquaint with this manual and start operating and managing the boiler.
9. We guarantee 1 year of quality free of charge after installation. However, the user takes
responsibilities itself caused by its mistake and carelessness within the term of guarantee.
The fuel of incineration boiler is flammable waste. It is the cause of generating
smoke and clogging combustion nozzle in case of incinerating the metal, flame
retarding waste(PVC, etc), flam proof fabric and non-flammable waste. Don’t put
explosive materials(Butane gas can, oil, lighter) into the boiler since it could
explode. Also the wet waste should be put after drying.
The manufacturer doesn’t have responsibility of the problem caused by renovation
of pipe and electronic devices without notice.
Be careful of burning body since the main body and pipes are running on a high
temperature. The operator should wear the protective mask and gloves, install a fire
extinguisher in boiler room.
Tap water or ground water which is used for the boiler is including all sorts of
impurities. In case of a steam boiler, these impurities will be piled up. It causes
scale and corrosion of boiler, making the boiler stop, shorten the lifetime and
decline the efficiency. Therefore, please make sure how to clean and inspect the
boiler, and receive routine maintenance from cleaning company of boiler water
treatment.
The allowable error is within ±10% about main electronic voltage which is supplied
into the boiler.
If it exceeds this figure or it is unstable, the motor and electronic component can be
damaged so that you should install the automatic voltage control device.
Also, the water should be supplied as much as the amount of steam used. If the
water is less than used steam, please install water supply motor.
8. Please consult with the agent or A/S team of head office in case of occurring the
problem and breakdown.
Warning
Содержание WT-2500-4000
Страница 2: ...2 3 4 5 6 7 1 8 A S 9 1 1 PVC 10...