
20
2.
For the Installer
– Fit floor plate (part 14, attached to integral fuel hopper for transport, see Fig. 9) on left side – Fig. 11, Fig. 12.
Fig. 11 Attaching the floor plate
Fig. 12 Attaching the floor plate
– Align the boiler and floor plate with the set screws horizontally or slightly inclined toward the rear – Fig. 13.
– Remove support for integral fuel hopper (part 15) from boiler by removing transport attachments (cable ties)
– Fig. 14.
– Unscrew auger tube rotary feeder (part 12) with transport attachments (sheet metal brackets) from boiler
(Fig. 15) and remove transport attachments – Fig. 16.
Fig. 13 Aligning boiler
Fig. 14 Boiler aligned with floor plate
Fig. 15 Unscrewing transport attachments
from boiler
Fig. 16 Unscrewing transport attachments
from rotary feeder
Integral fuel
hopper support
Auger tube