
page 1 – 5
E-1 / Apr 2010
G E N E R A L I N F O R M A T I O N
In order for failsafe systems to perform as designed, always have BOTH rackmount
supplies powered up and connected to their associated equipment.
Energizing
Assuming the E-1 control surface mainframe is properly placed, and its PSE-1 power
supply (or supplies) correctly rackmounted and connected to the control surface, you
may now energize the rackmount power supply by plugging it into the AC mains. The
“GOOD” LED on the power supply front panel should light up to indicate the presence
of the voltage. The control surface’s switches will assume factory default settings.
Note: To de-energize the control surface, unplug the rackmount power supply’s AC
cord from the AC mains. Never de-energize the control surface by disconnecting the
cable that connects the control surface and power supply together.
Once you have verified proper power-up, unplug the rackmount power supply to de-
energize the control surface. You may now proceed to wire up audio and control
connections.
I/O Connections
All user wiring to and from the E-1 control surface is made via connectors located
on the control surface’s rear panel. Two 2-pin “D-SUB 2V2” style connectors at the
center of the control surface’s rear are for power supply connections. An external ste-
reo, line level headphone signal plugs into the female DB-9 connector, located next to
power supply jacks. This signal is routed to internal amplifiers that feed the headphone
jack, located on the front right -hand side of the surface’s pan.
There are two RJ-45 connectors:
• ENET – connects to a standard Ethernet network switch.
• MIXER – connects to a specific DSP card in an E ‑Series SAT cage for TDM‑based
system configuration. This port is not used if the E‑1 is part of a WheatNet‑IP system.
A PS-2 connector for keyboard rounds out the rear panel. The photo below shows
connector locations. For all wiring pinout connections refer to Chapter 4.
E-1 / May 2017
Содержание E1
Страница 1: ...E 1 Digital Control Surface TECHNICAL MANUAL 600 Industrial Drive New Bern North Carolina USA 28562 ...
Страница 66: ...page 5 4 IPE 1 Input Panel Switch Card Load Sheet E 1 Apr 2010 ...
Страница 73: ...page 5 11 MNE 1 Master Panel Switch Card Load Sheet E 1 Apr 2010 ...
Страница 78: ...page 5 16 HC 3 Host Controller Card Load Sheet E 1 Dec 2010 ...
Страница 80: ...page 5 3 E 1 Apr 2010 S C H E M A T I C D R A W I N G S PSE 1 Power Supply Load Sheet page 5 18 E 1 June 2011 ...