38
13 | Initial Operation
7 Have the coolant hoses been installed so that they are below the
filler cap?
8 Has the coolant flow been verified?
Electrical
Complete
(Yes/No/Comments)
1 Has all wiring been safely secured away from moving components
and/or heat sources?
2 Check for proper power and ground connections.
3 Has the blower motor functionality been tested (if applicable)?
4 Check for proper fuse tap connection (if applicable).
5 Verify that the correct fuses are in the specified locations per the in-
stallation manual.
6 Ensure heater and vehicle fuse boxes are closed and secure. Was
the Webasto-supplied fuse block installed in a location that is pro-
tected from water and/or moisture?
7 Ensure the blower motor resistor is securely mounted and has suffi-
cient clearance from any plastic components and the battery.
8 Ensure the battery is mounted securely and connections are prop-
erly tightened.
9 Ensure the battery has a full charge.
Fuel Systems
Complete
(Yes/No/Comments)
1 Is the standpipe properly mounted in the fuel tank?
(sealed, structural integrity maintained)
2 Validate that the standpipe does not interfere with the function of
the fuel sending unit by checking the fuel gauge for proper opera-
tion before completing installation of the fuel tank.
3 Verify that all fuel lines are properly secured and are a safe distance
(min. 4 in.) from exhaust systems and/or components.
4 Check all fuel lines for leaks or kinks.
5 Check fuel line clamps for proper positioning and tightness. Ensure
the fuel system is free of leaks.
6 Ensure the fuel pump is securely mounted in a cool location.
NOTE:
The vehicle fuel tank area is generally a location with min-
imal sound transfer paths to the vehicle interior.
Exhaust Systems
Complete
(Yes/No/Comments)
1 Are the muffler and clamps securely tightened?
Содержание thermo top evo
Страница 32: ...32 12 WiringDiagrams 12 2 Thermo Top EVO with SmarTemp 2 0 Fig 34 ThermoTop EVO with SmarTemp 2 0 ...
Страница 46: ...15 NOTES NOTES ...
Страница 47: ......