Automatic sauna splash system, Sauna Plus 8
Index: 05 Change date: 11.09.2018
Operating instructions no.: BA DW 003-05 Sauna Plus 8 EN 24+230V.docx
Page 23 of 76
Thereafter, replace the lock washer and the transparent pump cover. The roller
carrier installation is then completed.
Proceed in reverse order to de-install the roller carrier and the hose holder.
Insert the safety connector into an appropriate mains socked and switch on the
device at the main switch.
The first splash can be delayed by 0-30 minutes after the voltage has been switched
on when the switch-on delay is activated. This prevents a splash from being
performed when the sauna heater is cold. Subsequent splashes follow according to
the cycle selected.
The device is then ready to use.