SmartPlate EV Installation, Operation and Maintenance Manual
CHAPTER 5
– OPERATION
OMM-0147_C
• SP-102 • 3/2/2021 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page
35
of
72
SHUTTING DOWN THE SYSTEM
Instructions
Figure 5.3. Typical SmartPlate EV Piping
7. To place the unit back in service, fill the unit and perform the pre-operational checks and
start-up procedures described in Sections 5.2 and 5.3.
8. Drain all water inside the unit.
RELIEF VALVE
ISOLATION VALVES
DOMESTIC WATER
STRAINER
BOILER WATER
STRAINER
ISOLATION VALVES
AIR PLUGS