SmartPlate EV Installation, Operation and Maintenance Manual
CHAPTER 1
– GENERAL INFORMATION
OMM-0147_C
• SP-102 • 3/2/2021 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page
10
of
72
1.4 SmartPlate EV PIPING ASSEMBLIES
All SmartPlate EV models include
a 2” diameter piping assembly. This assembly includes the
following components:
•
Flow Meter
•
Strainers (Boiler Water & DHW Sides)
•
Blow-down Valves
•
2” Piping and support brackets
•
3-Way Valve
•
Heat Exchanger
•
DHW Relief Valve
•
Boiler Relief Valve
– optional
Figure 1.3. SmartPlate EV Piping Assembly plus Other Components
PRESSURE RELIEF
VALVE
ISOLATION BALL
VALVES & STRAINER
HEAT EXCHANGER
3-WAY CONTROL
VALVE
ISOLATION BALL VALVES
POWER BOX
STRAINER WITH
BLOW-DOWN VALVE
CONTROL BOX
RETURN TO
BOILER
DHW
OUTLET
BOILER
WATER INLET
DHW INLET
FLOW METER