SmartPlate EV Installation, Operation and Maintenance Manual
CONTENTS
OMM-0147_C
• SP-102 • 3/2/2021 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page
2
of
72
TABLE OF CONTENTS
1.1 WARNINGS & CAUTIONS ..................................................................................................................... 5
1.2 INTRODUCTION ................................................................................................................................... 6
1.3 ELECTRONIC CONTROL SYSTEM II (ECS II) ........................................................................................... 7
1.4 SmartPlate EV PIPING ASSEMBLIES ................................................................................................... 10
1.5 3-WAY ELECTRONIC CONTROL VALVE ............................................................................................... 11
2.1 INTRODUCTION ................................................................................................................................. 13
2.2 RECEIVING AND UNPACKING ............................................................................................................ 13
2.3 SITE SELECTION AND PREPARATION ................................................................................................. 14
2.4 HEATING FLUID AND DOMESTIC HOT WATER (DHW) PIPING........................................................... 15
2.5 SmartPlate EV & BENCHMARK PLATINUM BOILERS ......................................................................... 15
2.6 ELECTRICAL WIRING CONNECTIONS ................................................................................................. 16
FUNCTIONAL DESCRIPTION ..........................................................................21
3.1 INTRODUCTION ................................................................................................................................. 21
3.2 MECHANICAL OVERVIEW .................................................................................................................. 21
3.3 ELECTRONIC CONTROL OVERVIEW ................................................................................................... 21
3.4 OVER-TEMPERATURE CONTROL AND SAFETY FEATURES ................................................................. 22
5.1 INTRODUCTION ................................................................................................................................. 33
5.2 PRE-OPERATIONAL CHECKS, INITIAL START-UP ................................................................................ 33
5.3 SHUTTING DOWN THE SYSTEM ......................................................................................................... 34
SCHEDULED MAINTENANCE .........................................................................37
6.1 INTRODUCTION ................................................................................................................................. 37
6.2 PLATE PACK LEAKAGE CHECKS .......................................................................................................... 37
6.3 OVER-TEMP SWITCH CHECK .............................................................................................................. 38
6.4 STRAINER INSPECTION AND CLEANING ............................................................................................ 38
6.5 3-WAY CONTROL VALVE OPERATIONAL CHECK ................................................................................ 39