28
Pumphead replacement
Always isolate the pump from the mains power supply before opening any
guard or track, or performing any positioning, removal or maintenance
operation.
28.1
Pumphead replacement
520R
620RE, 620RE4 and 620R safeguarding
Primary safety on 630 series pumps is provided by the tool-lockable
pumphead guard. Secondary (backup) protection is provided in the form of an
electrical guard switch which stops the pump if the pumphead guard is
opened. The electrical guard switch on cased pumps should never be used as
primary protection. Always disconnect the mains power supply to the pump
before opening the pumphead guard.
Removal
1.
2.
3.
4.
5.
6.
Refitting
Check adaptor ring
Ensure correct adaptor ring fitted
1.
2.
3.
136
m-630bpn-en-08
Содержание 630 Bp
Страница 21: ...1 2 m 630bpn en 08 21...
Страница 46: ...14 7 Network topology Star network Ring network 46 m 630bpn en 08...
Страница 105: ...22 5 Flow Sensor Reading The flow sensor value can be read via the Flow sensor reading screen m 630bpn en 08 105...
Страница 107: ...Press SELECT to choose an option Press EXIT to return to the screen from where the MENU was called m 630bpn en 08 107...
Страница 130: ...24 Help 24 1 Help Select Help from the main menu to access the help screens 130 m 630bpn en 08...
Страница 150: ...Number Spare Description 8 TT0005 10mm 3 8in spanner 9 MRA3026A Track assembly 150 m 630bpn en 08...