16
•
Select enough tube length for the curve of the pump track.
Slide the tube into the open pumphead. The tube must not be twisted or stretched against the rollers.
•
Ensure the tubing locates in the centre of the tube clamps. Carefully lower the track. Check that the tube is not
crushed in the clamps or over stretched.
When using Marprene tubing
Re-tension new tube after the first 30 minutes of running. Stop the pump. Release the flip top. Allow the tube to re-
settle naturally across the rollers. Re-clamp the tube. Re-start the pump. This will correct the normal stretching
that occurs with new Marprene tube. The correct tension is essential for good tube life.
Pumphead spar
Pumphead spar
Pumphead spar
Pumphead spar
Pumphead spares
es
es
es
es
1
033.3411.000
313D three roller pumphead
2
033.3431.000
313X extension three roller pumphead
1
033.4411.000
314D four roller pumphead
2
033.4431.000
314X four roller extension pumphead
1
033.3511.000
313D2 three roller pumphead for 2.4mm wall tube
2
033.3531.000
313X2 three roller extension pumphead for 2.4mm wall tube
1
033.4511.000
314D2 four roller pumphead for 2.4mm wall tube
2
033.4531.000
314X2 four roller pumphead for 2.4mm wall tube
Содержание 323Du
Страница 1: ...323E 323S 323U 323Du 323esudu gb 04 pdf ...