Index-2
unpacking
2-2
detergents
C-18
dimensions
2-4
E
EC Authorized Representative
vi
electrical
specifications
B-1
electrical symbols
A-12
electricity source, connecting
2-5
Empower data system, connecting
2-14
environmental specifications
B-1
equipment guidelines
iv
,
A-6
erbium verification, performing
4-3
error messages
4-1
eSAT/IN module
2-14
Ethernet cable, connecting
2-6
external analog data collection device,
connecting
2-13
F
flammable solvents
A-4
flow cell
clearing bubbles
4-7
comparison
1-5
conditions
2-22
flushing
3-4
installing
3-6
maintaining
3-4
removing
3-5
replacing
3-5
specifications
B-4
TaperSlit
1-4
unpacking
2-2
flushing, flow cell
3-4
fuses, replacing
3-10
G
gas
requirements
2-18
solubility
C-7
–
C-8
generating
inject start
2-10
stop flow
2-12
H
handling symbols
A-13
hardware, preparing
3-1
I
inject start
connection
2-7
generating
2-10
signal
2-7
injection trigger signals, connecting
2-15
input and output connectors
2-9
installing
detector
2-2
lamp
3-8
network guidelines
2-7
intended use
v
interface connections, detector
4-4
ISM classification
v
L
lamp
cooling time
3-7
installing
3-8
LED
2-20
,
4-6
removing
3-7
replacing
3-7
lamp energy, reading
4-3
LED
lamp
2-20
,
4-6
monitoring
2-20
power
2-20
,
4-6
light path, optics assembly
1-2
line spikes
4-6
Содержание 2998
Страница 12: ...xii Table of Contents...
Страница 26: ...1 14 2998 PDA Detector Optics Principles...
Страница 62: ...3 12 Maintaining the Detector...
Страница 82: ...5 10 Spectral Contrast Theory...
Страница 96: ...A 14 Safety Advisories...