manualshive.com logo in svg
background image

8

9

Waterlogic 100 Technical Manual - Issue B, September 2011

Main Parts Layout

Hot and Cold

FIL
TER

FIL
TER

IN (Water)

SOLENOID

VALVE

SOLENOID

VALVE

HOT WATER OUT

COLD WATER OUT

AIR VENT

FILTER

DRYER

COLD

SENSOR

COLD

TANK

HOT

TANK

COMPRESSOR

CONDENSER

Pre Delivery 

Inspection Procedures (PDI)

CAUTIONS:

• Only competent trained technicians should work on Waterlogic products.

• Waterlogic units may weigh over 25KG. We recommend caution when lifting.  

• Packing materials could present a trip hazard. Keep them off the floor. 

• Take care not to allow the power lead to get wet.  If the lead gets wet it must 

  not be used.

1.

  Unpack and carry out a visual inspection of the unit for any transit damage.

2.

  Remove the top cover and the lower front panel and visually inspect the 

  internals of the machine for any wires or pipes that may have come loose in transit.

3.

  Connect the water supply.

4.

  Ensure the switch on the rear of the machine is in the off position and connect

  the unit to a power supply.

5. 

The unit is now live and suitable safety precautions should be taken.

6.

  Flush water through the hot tank first until the water runs clear of any carbon

  fines. Approximately 10 litres should be flushed through the filters

7.

  Now flush water through the Cold Tank. Approximately 10 litres should be

  flushed through the filters (20 litres if cold only)

8. 

Once you are sure that water is running through both the cooling and heating

  wetted circuit then turn on the heater and compressor switch at the rear of the

 machine.

9.

  Carry out a visual inspection for any water leaks.

10.

The hot water will heat to approximately 85°C. 

11.

 To test the cold water wait until the compressor has shut off. 

  Test the temperature of the 2nd cup of water. It should be between 5 and 8°C.

12.

 Inspect the cold water produced for clarity and taste. If required flush more

  water to remove any adverse taste or carbon fines.

13. 

Return the switch to the off position and isolate the power and water 

  to the machine.

14. 

Drain the hot tank and cold tank.

15.

 Replace all panels, clean the machine and repack the machine.

16.

 Waterlogic recommend that all units are fully electrically (PAT) tested on site by

  the commissioning engineer as damage may have occurred during transit 

  to the unit’s final destination.

Содержание WL100

Страница 1: ...Waterlogic 100 Technical Manual Issue B September 2011 WL100 Technical Manual...

Страница 2: ...es PDI 9 Installation Procedures 10 Operating Instructions 14 Maintenance and Servicing 16 Sanitising or Descaling 17 Fault Finding 18 Technical Specifications and Warranties 20 End of Life 22 ROHS 22...

Страница 3: ...The water is stored in the Cold Tank The cold tanks temperature is controlled by a thermostat that is set at the factory The thermostat set point is marked at the back of the machine by a small dot H...

Страница 4: ...Free Standing model and 50 grams of R134a gas for the Mini Model WATER PIPE AND FITTINGS The inlet and the internal water circuit pipe sizes used are 1 4 and 5 16 The entire internal water circuit an...

Страница 5: ...ecautions should be taken 6 Flush water through the hot tank first until the water runs clear of any carbon fines Approximately 10 litres should be flushed through the filters 7 Now flush water throug...

Страница 6: ...chine re gardless whether it is a mini or a free standing model Inspect the electrical socket the machine plug and the power cable for any transit damage Now plug the power lead into the back of the m...

Страница 7: ...e flushed and sanitised every 6 months Waterlogic International strongly recommends the use of an anti flood device Figure 1 is the recommended installation kit Fig 1 Recommended Installation Kit 14 T...

Страница 8: ...utton continuously until cup is full Never try to fill more than one vessel at a time COLD WATER Push the cold water button blue Cold water dispenses HOT water Push the 2 hot red buttons together Hot...

Страница 9: ...hot tank Let the WL100 stand for a minimum of 15 minutes and then flush out the sanitizing solution Replace or refit the filters remove the empty filter housing and reconnect the water supply to the W...

Страница 10: ...l fault finding procedures must be carried out by a technician trained by Waterlogic International or their nominated distributor Please take great care and suitable health and safety measures when fa...

Страница 11: ...rranties SAFETY Subject to the standard terms and conditions of sale a copy of which has been provided to you neither Waterlogic International Limited Waterlogic nor any affiliated companies shall be...

Страница 12: ...into the surface of our products giving them built in sustainable antimicrobial protection BioCote s silver technology has been tested by an independent laboratory to show its ability to inhibit the g...

Страница 13: ...ue Tube ST 11 1 4 Equal Tee Connector ST 12 Solenoid Valve 24DC Single 13 1 4 Blue Tube ST 14 5 16 X1 4 Reducing Elbow Connector ST 15 JG LLDPE Tube Blue 8mm PE 0806 100M B 16 2Liter cold tank 17 JG L...

Страница 14: ...et for Plug Connection 7 Gasket for Power Socket 8 Side Panel 9 Plastic Handel 10 Plastic Cap for 1 4 Bulkhead Fitting 11 JG Bulkhead Connector Union 1 4 1 4 12 Compressor R134a 1 8HP 220 240V 50 60Hz...

Страница 15: ...rip Tray Insert 27 Plastic PCB Cover 28 PCB for WL100 29 Front Hatch Panel 30 Silicon Button Key Mat 31 Button Cover 32 Label 33 Drip Tray Grill 34 Drip Tray Body 35 Power Transformer UV 220V 50Hz 36...

Страница 16: ...Beacon Court Sandyford Dublin 18 Ireland www waterlogic com Waterlogic USA 4141 N 156th Street Omaha NE 68116 Speak to a Water Expert Rest of the world exportsales waterlogic com 353 1 293 1960 USA Ca...

Отзывы: