8
Figure 5a.
Figure 5b.
Cabinet tube connections
1. See Figure 5b above. This rear view of the cabinet shows the three water connections that
must be made to the cabinet. When cutting the tube lengths, be sure to allow enough tube
for the cabinet to be placed in its final position and then to be pulled out for easy
maintenance access, once the installation is complete. Be sure to remove the C-clips from
the RO connection fittings and secure them in place once the connections are completed.
2. Connect the red tube from the water supply valve with the system push-on ‘water inlet’
fitting on the cabinet, after cutting the ¼” red supply tube to the length required. Make
sure tube cuts are clean and square and the tube is fully inserted into the inlet fitting.
3. Connect the white (or blue) ¼” tube to the faucet inlet fitting. Connect the other end to the
’to faucet’ outlet fitting on the cabinet after cutting the faucet tubing to the desired length.
Make sure tube cuts are clean and square and the tube is fully inserted into the fitting.
4. Connect the black drain tube by inserting the tube into the push-on drain saddle fitting.
Next, connect the other end to the ’to drain’ cabinet outlet fitting after cutting the drain
tubing to the desired length. Make sure tube cuts are clean and square and the tube is
fully inserted into the fitting.
!
DO NOT ATTEMPT TO USE ANY WATER FROM THE SYSTEM UNTIL THE NEXT STEP IS
COMPLETE.
Содержание Fusion 360
Страница 14: ...14 ...
Страница 15: ...15 PAGE LEFT INTENTIONALLY BLANK ...