26
Piston Cartridge Assembly Replacement
Meter Replacement and Service
3. Inspect the inside of the valve to
make sure that there is no foreign
matter that would interfere with the
valve operation.
4. Put food grade silicone grease on
the o-rings of the new piston car-
tridge assembly and install it inside
the valve body.
4. Apply silicone lubricant to four new o-rings and assemble
to four ports on new meter module.
5. Assemble meter to control valve. Note, meter portion of
module must be assembled at valve outlet.
6. Push resin tank back to the plumbing connections and
engage meter ports with bypass valve or yoke.
7. Attach two clips and screws at bypass valve or yoke. Be
sure clip legs are firmly engaged with lugs.
1. Disconnect the meter cable from the meter.
2. Remove two screws and clips at bypass valve or yoke.
Pull resin tank away from plumbing connections.
3. Pull meter module out from control valve.
Screw
Clip
Lubricate O-rings
Flow Meter should be
attached to the outlet
side of the valve
Flow Straightainer
Inside the Outlet
Port
Outlet Port
Meter
Assembly
Meter Cable
This O-ring goes to the
bottom of the cartridge
Cartridge Assembly
All 5 O-rings need to be
inspected for damages
and lubricated
1. Follow steps 1 to 5 of timer replace-
ment.
2. Use a flat head screw drive on the
notch of the valve body as shown
to loosen the piston cartridge, pull
the cartridge out of the body using
pliers.
5. Reinstall the timer assembly, brine
valve bracket and meter cable.
B
A
1
3
4
4
3
2
1
2
THIS DOCUMENT IS SOLELY THE PROPERTY OF PENTAIR
WATER TREATMENT. REPRODUCTION, USE DISCLOSURE, OR
TRANSMISSION OF THIS DOCUMENT OR DETAILS CONTAINED
HEREIN, IN PART OR IN WHOLE, IS PROHIBITED WITHOUT
THE WRITTEN CONSENT OF PENTAIR WATER TREATMENT
ENGINEERING. THIS DOCUMENT AND ANY COPIES SHALL BE
RETURNED TO PENTAIR WATER TREATMENT UPON WRITTEN
REQUEST.
TITLE
SIZE
SCALE
SHEET 4 OF 4
DWG NO.
REV
Pentair Residential
Filtration
CHECKED
APPROVED
APPROVALS
DATE
THIRD ANGLE
PROJECTION
DRAWN
SOLIDWORKS FORMAT
LEVEL I
LEVEL II
LEVEL III
CRITICALITY SYMBOLS PER QPSP-001.2
DATE AND TIME
D
1:1
5
5
D
C
6
7
8
6
7
8
B
C
D
REVISIONS
DATE
APP'D
DESCRIPTION
REV.
ECN
ZONE
_
A
THIS DRAWING MUST BE COMPARED TO THE ERP SYSTEM TO ENSURE CORRECT REVISION LEVEL PRIOR TO USE.
LAST SAVED IN SMARTEAM:
DO NOT SCALE DRAWING. DIMS. ARE IN INCHES [mm]
INTERPRET DIMS AND TOLERANCES PER ASME Y14.5M -1994
UNLESS OTHERWISE SPECIFIED:
CORNER FILLETS R.005-.020 [.127-.508]
TOLERANCES:
ANGLES :
1
1 PLACE .X:
.015 [0.38]
2 PLACE .XX:
.01 [0.3]
3 PLACE .XXX:
.005 [0.13]
THE COMPONENT, PART, OR ASSEMBLY DESCRIBED IN THIS DOCUMENT MUST COMPLY WITH THE EU (EUROPEAN UNION) DIRECTIVE:
RoHS DIRECTIVE 2002/95/EC,
BR42889
Содержание 6200 SXT
Страница 1: ...6200 SXT Upflow Control Valve for Water Conditioning and Treatment Purposes Service Manual...
Страница 21: ...Wiring Diagram 21...
Страница 22: ...6200SXT Upflow Brining Rates 22 6200SXT Upflow Brining Rates with Water 20 PSI Regulated Cap...
Страница 29: ...29 6200 SXT Valve Dimensional Drawings All dimensions are in Inches mm...
Страница 35: ...35...