Timer Operation

Meter Immediate Control

A meter immediate control measures water usage and 
regenerates the system as soon as the calculated system 
capacity is depleted. The control calculates the system 
capacity by dividing the unit capacity (typically expressed 
in grains/unit volume) by the feed water hardness and 
subtracting the reserve. Meter Immediate systems 
generally do not use a reserve volume. However, in twin 
tank systems with soft-water regeneration, the reserve 
capacity should be set to the volume of water used during 
regeneration to prevent hard water break-through. A Meter 
Immediate control will also start a regeneration cycle at the 
programmed regeneration time if a number of days equal 
to the regeneration day override pass before water usage 
depletes the calculated system capacity.

Meter Delayed Control

A Meter Delayed Control measures water usage and 
regenerates the system at the programmed regeneration 
time after the calculated system capacity is depleted. As 
with Meter Immediate systems, the control calculates the 
system capacity by dividing the unit capacity by the feed 
water hardness and subtracting the reserve. The reserve 
should be set to insure that the system delivers treated water 
between the time the system capacity is depleted and the 
actual regeneration time. A Meter Delayed control will also 
start a regeneration cycle at the programmed regeneration 
time if a number of days equal to the regeneration day 
override pass before water usage depletes the calculated 
system capacity.

Time Clock Delayed Control

A Time Clock Delayed Control regenerates the system on a 
timed interval. The control will initiate a regeneration cycle 
at the programmed regeneration time when the number 
of days since the last regeneration equals the regeneration 
day override value.

Day of the Week Control

This control regenerates the system on a weekly schedule. 
The schedule is defined in Master Programming by setting 
each day to either “off” or “on.” The control will initiates a 
regeneration cycle on days that have been set to “on” at 
the specified regeneration time.

Control Operation During Regeneration

During regeneration, the control displays a special 
regeneration display. In this display, the control shows the 
current regeneration step number the valve is advancing 
to, or has reached, and the time remaining in that step. The 
step number that displays flashes until the valve completes 
driving to this regeneration step position. Once all 
regeneration steps are complete the valve returns to service 
and resumes normal operation.
Pressing the Extra Cycle button during a regeneration cycle 
immediately advances the valve to the next cycle step 
position and resumes normal step timing.

Control Operation During Programming

The control only enters the Program Mode with the valve in 
service. While in the Program Mode, the control continues 

to operate normally monitoring water usage and keeping 
all displays up to date. Control programming is stored in 
memory permanently, eliminating the need for battery 
backup power.

Manually Initiating a Regeneration

1.   When timer is in service, press the Extra Cycle button for 5 

seconds on the main screen.

2.    The timer advances to Regeneration Cycle Step #1 (brine 

draw & slow rinse), and begins programmed time count 
down.

3.   Press the Extra Cycle button once to advance valve to 

Regeneration Cycle Step #2 (backwash).

4.   Press the Extra Cycle button once to advance valve to 

Regeneration Cycle Step #3 (rapid rinse).

5.   Press the Extra Cycle button once to advance valve to 

Regeneration Cycle Step #4 (brine refill).

6.   Press the Extra Cycle button once more to advance the 

valve back to in service.

NOTE:

 If the unit is a filter, the cycle step order may change.

 NOTE:

 A queued regeneration can be initiated by pressing the Extra Cycle 

button. To clear a queued regeneration, press the Extra Cycle button 
again to cancel. If regeneration occurs for any reason prior to the delayed 
regeneration time, the manual regeneration request shall be cleared.

Control Operation During a Power Failure

The SXT includes integral power backup. In the event of 
power failure, the control shifts into a power-saving mode. 
The control stops monitoring water usage, and the display 
and motor shut down, but it continues to keep track of the 
time and day for a minimum of 48 hours.
The system configuration settings are stored in a non-volatile 
memory and are stored indefinitely with or without line 
power. The Time of Day flashes when there has been a 
power failure. Press any button to stop the Time of Day from 
flashing.
If power fails while the unit is in regeneration, the control will 
save the current valve position before it shuts down. When 
power is restored, the control will resume the regeneration 
cycle from the point where power failed. Note that if power 
fails during a regeneration cycle, the valve will remain in 
it’s current position until power is restored. The valve system 
should include all required safety components to prevent 
overflows resulting from a power failure during regeneration.
The control will not start a new regeneration cycle without 
line power. If the valve misses a scheduled regeneration due 
to a power failure, it will queue a regeneration. Once power 
is restored, the control will initiate a regeneration cycle the 
next time that the Time of Day equals the programmed 
regeneration time. Typically, this means that the valve will 
regenerate one day after it was originally scheduled. If the 
treated water output is important and power interruptions 
are expected, the system should be setup with a sufficient 
reserve capacity to compensate for regeneration delays.

Valve Positions

The position label affixed to the brine cam indicates the 
cycles and service positions of the control valve.

Содержание 6200 SXT

Страница 1: ...6200 SXT Upflow Control Valve for Water Conditioning and Treatment Purposes Service Manual...

Страница 2: ...al This unit is designed to be installed on potable water systems only This product must be installed in compliance with all state and municipal plumbing and electrical codes Permits may be required a...

Страница 3: ...let Valve Alone GPM Piston Standard Upflow Continuous 21 Peak 25 psi drop 26 Cv flow at 1 psi drop 5 5 Max backwash 25 psi drop 17 Max Rapid Rinse 25 psi drop 10 Regeneration Downflow Upflow Upflow on...

Страница 4: ...n line flow control 4 Cut the distributor tube 1 88 4 7 cm below the top of the tank 5 Lubricate the distributor O ring seal and tank O ring seal Place the main control valve on tank Note Only use sil...

Страница 5: ...le plumbing codes Please refer to the manual regeneration part of the timer operation section in this manual 1 Position the valve to the brine slow rinse position Ensure the unit is drawing water from...

Страница 6: ...nters the Program Mode with the valve in service While in the Program Mode the control continues to operate normally monitoring water usage and keeping all displays up to date Control programming is s...

Страница 7: ...Override The system s day override setting RT Regen Time The time of day the system will regenerate BW BD RR BF Regen Cycle Step Times The time duration for each regeneration step Ad justable from OFF...

Страница 8: ...ode DF This is the first screen that appears when entering Master Programming Mode The Display Format setting specifies the unit of measure that will be used for volume and how the control will displa...

Страница 9: ...t capacity of the system media Enter the capacity of the media bed in grains of hardness when configuring a softener system and in the desired volume capacity when configuring a filter system This opt...

Страница 10: ...rner of the screen The abbreviations used are listed below If the system has been configured with the OTHER valve type the regeneration cycles will be identified as R1 R2 R3 R4 R5 and R6 Each cycle st...

Страница 11: ...ess The hardness of the inlet water used to calculate system capacity for metered systems RC Reserve Capacity The fixed reserve capacity CD Current Day The current day of week NOTES Some items may not...

Страница 12: ...te since the last regeneration cycle This option setting is identified by PF in the upper left hand corner of the screen 4 Press the Up button Use this display to view the Hours in Service since the l...

Страница 13: ...HE PROPERTY OF PENTAIR WATER TREATMENT REPRODUCTION USE DISCLOSURE OR TRANSMISSION OF THIS DOCUMENT OR DETAILS CONTAINED HEREIN IN PART OR IN WHOLE IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF PENTAIR...

Страница 14: ...r Flow Washer BLFC 16 19335 Fitting BLFC 3 8 20 19625 Nut Assembly 3 8 Plastic 95 60422 XX BLFC Assembly Specify XX GPM 6200 Service Kits Brine Line Flow Control Kits 6200 Service Kits Brine Valve Dwg...

Страница 15: ...r Filter 66 18275 X Throat Injector Specify Size X 65 18274 X Nozzle Injector Specify Size X 12 10141 O Ring 010 67 18273 Generator Vortex 13 13771 O Ring 012 90 61514 XX Injector Assembly Specify Siz...

Страница 16: ...Service Kits Other Parts Dwg Part Part Description 37 17020 Screw Stl Hex 6 20 X 3 8 51 040050 Screw Hex Washer 34 42919 Cam Brine 85 43107 Label Cam Position Softener 43121 Label Cam Position Filter...

Страница 17: ...lack 43052 02 Cover Cream 54 10231 Screw Slot Hex 1 4 20 X 1 2 49 19597 Motor 24V 50 60 Hz 35 43053 01 Backplate Black 43053 02 Backplate Cream 41 19581 Bracket Drive 43 10302 Insulator Limit Switch 3...

Страница 18: ...636 Yoke 1 1 4 NPT 40636 49 Yoke 1 1 4 Sweat Item No Quantity Part No Description 1 1 19645 Body Safety Brine Valve 2310 2 1 19803 Safety Brine Valve Assembly 3 1 19804 Screw Socket Hd Set 10 24 X 75...

Страница 19: ...oft Water To Drain Hard Water Soft Water To Drain Hard Water Soft Water To Drain Hard Water Soft Water To Drain Hard Water Soft Water Hard Water Soft Water Hard Water Soft Water To Drain Hard Water So...

Страница 20: ...Water Conditioner Flow Diagrams 20 Rapid Rinse Position Brine Refill Position Hard Water Soft Water To Drain Hard Water Soft Water To Drain...

Страница 21: ...Wiring Diagram 21...

Страница 22: ...6200SXT Upflow Brining Rates 22 6200SXT Upflow Brining Rates with Water 20 PSI Regulated Cap...

Страница 23: ...valve body and discard it 4 Apply silicone lubricant to the gasket and install around oval extension on injector cap 5 Apply silicone lubricant to two new o rings and install over 2 bosses of the new...

Страница 24: ...ttom of brine valve hole 4 Apply silicone lubricant to new o ring and install at bot tom of brine valve hole 5 Apply silicone lubricant to o ring on new valve assembly and press into brine valve hole...

Страница 25: ...ne cam Close the front cover of the control valve 7 Reconnect meter cable Piston screw Timer Assembly Self tapping screw Screw Screw Screw Screw Bracket Brine Valve Brine Cam Meter Cable 1 Disconnect...

Страница 26: ...1 to 5 of timer replace ment 2 Use a flat head screw drive on the notch of the valve body as shown to loosen the piston cartridge pull the cartridge out of the body using pliers 5 Reinstall the timer...

Страница 27: ...is Replace it with a new washer if neccessary 4 Re install the BLFC housing and re tainer 1 Disconnect the brine line retainer clip 1 Disconnect the drain line retainer clip 2 Remove the DLFC assembly...

Страница 28: ...the circuit board from valve front cover by removing two screws 2 Disconnect the meter cable and power head harness from the circuit board 3 Replace and connect the new cir cuit board on the front co...

Страница 29: ...29 6200 SXT Valve Dimensional Drawings All dimensions are in Inches mm...

Страница 30: ...30 57 40 51 37 24 53 52 54 36 37 37 37 55 32 45 42 43 44 34 46 47 48 41 49 31 33 35 50 60 81 82 85 6200 SXT Control Valve Exploded View...

Страница 31: ...13 11 29 58 6 59 56 76 12 64 13 67 65 66 68 72 73 74 17 75 71 70 86 69 61 63 62 77 78 79 80 84 17 87 88 27 92 94 89 95 93 91 90 Use in case of filter valve 96 23 Replace with in filter valve 91 No O...

Страница 32: ...KET 6200 PLASTIC 53 1 15137 SCREW HEX WASHER HEAD 54 3 10231 SCREW SLOT HEX 1 4 20 X 1 2 Item No Qty Part No Description 55 1 13363 WASHER HAGUE DRIVE 56 1 40058 SCREEN INJECTOR 57 1 43054 03 LABEL NO...

Страница 33: ...e A Air in water system A Assure that well system has proper air eliminator control Check for dry well condition B Improperly sized drain line flow control B Check for proper drain rate 6 Iron in cond...

Страница 34: ...ion and verify that it functions correctly If the error re occurs unplug the unit and contact technical support 2 Regen Failure The system has not regenerated for more than 99 days or 7 days if the Co...

Страница 35: ...35...

Страница 36: ...ll Free Phone 1 877 581 1833 Canada Headquarters WaterGroup Companies Inc 490 Pinebush Road Unit 1 Cambridge ON N1T 0A5 Canada Toll Free Phone 1 877 288 9888 www watergroup com Distribution Locations...

Отзывы: