Installation
TITANUS
MICRO·SENS
®
106
06/13
Incorporation and electrical connection of
additional modules
To prepare the electrical connections, the following steps must first be taken:
1. Make the number of cable entries required on the device base unit, e.g.
with a screwdriver.
2. Put the cable entries M20 and/or M25 into the corresponding cable
holes.
3. Feed the cable through the corresponding cable holes.
NOTICE
2x M20 and 1x M25 cable entries are supplied with the device.
The electrical connection is made via screw terminals 1a to 8a and 1b to 8b
on the TITANUS
MICRO·SENS
®
base unit. In so doing, note the permitted
cable cross-sections on the threaded joints and the permitted wire cross-
sections on the terminals for a max. 0.5 mm² - 2.5 mm² wires.
Figure 63: Layout of screw terminals in the device base unit
6.3
Содержание Titanus Micro-Sens
Страница 1: ...Air sampling smoke detection system Fire Detection TITANUS MICRO SENS Technical Manual ...
Страница 2: ......
Страница 4: ......
Страница 12: ......
Страница 16: ......
Страница 24: ......
Страница 74: ...Design TITANUS MICRO SENS 74 06 13 ...
Страница 100: ......
Страница 140: ......
Страница 148: ...Installation Pipe System TITANUS MICRO SENS 148 06 13 Figure 91 Attaching the aspiration reducing film sheet ...
Страница 164: ......
Страница 177: ...TITANUS MICRO SENS Commissioning 06 13 177 ...
Страница 186: ......
Страница 202: ......
Страница 203: ...Appendix Projection Tables System Product List Inspection Protocol Glossary Conformity certification pursuant to EU ...
Страница 204: ......
Страница 210: ......
Страница 226: ......
Страница 228: ......
Страница 234: ...TITANUS MICRO SENS Glossary TMS_A_Glossar e DOC Data 01 09 ...
Страница 235: ......
Страница 236: ......
Страница 237: ...TITANUS MICRO SENS 06 13 ...
Страница 238: ...TITANUS MICRO SENS ...