OPERATION
7.1
TRAINING THE OPERATING PERSONNEL
The operating personnel must be qualified to operate the entire system.
The operating staff must be familiar with the potential risks associated with
improper behavior as well as the necessary protective devices and measures.
Before work commences, the operating personnel must receive appropriate system
training.
7.2
EMERGENCY STOP
In the case of unforeseen occurrences:
B_04267
3
2
Open
Closed
Open
– Close ball valve (2);
– Open return valve (3).
7.3
TASKS
Ensure that:
commissioning is carried out in accordance with Chapter
.
1. Visual check: personal safety
equipment, grounding and all
devices ready to use.
B_04268
5
6
4
1
3
7
2
Closed
Open
2. Secure spray gun and insert
nozzle into the spray gun.
3. Close return valve (3).
4. Slowly open the ball valve (2).
5. Set required working pressure
on the pressure regulator (1).
6. Optimize spray pattern in
accordance with the spray gun's
operating manual.
7. Start work process.