![Wacker Neuson DV60 Скачать руководство пользователя страница 49](http://html1.mh-extra.com/html/wacker-neuson/dv60/dv60_operators-manual_3125742049.webp)
BA D24 en/us* 1.0 * D24_1_0_300.fm
3-9
Introduction
3
Meaning
Maintenance prop/center-pivot prop
Secure the skip before performing maintenance/install the center-pivot
prop before crane-lifting the machine.
Position
Near the center-pivot prop and the maintenance prop of the skip.
Meaning
Distance/articulation range
Keep a safe distance from the machine during operation.
Position
On either side of the loader unit.
Meaning
Do not point water jets directly at the cover.
Position
On the fuse box.
Fig. 14
Fig. 15
Fig. 16
Содержание DV60
Страница 8: ...EG 4 BA D24 en us 1 0 D24_1_0_konf fm Declaration of conformity...
Страница 16: ...1 8 BA D24 en us 1 0 D24_1_0_100 fm 1 Foreword...
Страница 47: ...BA D24 en us 1 0 D24_1_0_300 fm 3 7 Introduction 3 Warning labels Fig 9...
Страница 51: ...BA D24 en us 1 0 D24_1_0_300 fm 3 11 Introduction 3 Information labels Fig 21...
Страница 56: ...3 16 BA D24 en us 1 0 D24_1_0_300 fm 3 Introduction ANSI label option Fig 38...
Страница 62: ...3 22 BA D24 en us 1 0 D24_1_0_300 fm 3 Introduction...
Страница 97: ...BA D24 en us 1 0 D24_1_0_400 fm 4 35 Putting into operation 4 Enlarge camera image Abb 89...
Страница 108: ...4 46 BA D24 en us 1 0 D24_1_0_400 fm 4 Putting into operation...
Страница 140: ...5 32 BA D24 en us 1 0 D24_1_0_510 fm 5 Operation Notes...
Страница 150: ...6 10 BA D24 en us 1 0 D24_1_0_600 fm 6 Transportation Notes...
Страница 186: ...7 36 BA D24 en us 1 0 D24_1_0_710 fm 7 Maintenance...
Страница 207: ...BA D24 en us 1 0 D24_1_0_900 fm 9 17 Technical data 9 9 15 Dimensions...