![Vzor MAPK-302E Скачать руководство пользователя страница 23](http://html.mh-extra.com/html/vzor/mapk-302e/mapk-302e_operation-manual_1058105023.webp)
23
Fig. 2.2 − Dismantling the sensor for filling and replacement of electrolyte,
replacement of teflon film and membrane assembly
Remove the membrane assembly from the bushing. Draw electrolyte from
SPK into a syringe. Take the membrane assembly and, holding it with the mem-
brane down, inject electrolyte to fill two thirds of the volume, taking care to avoid
damaging the membrane. While continuing to keep vertical the membrane assem-
bly filled with electrolyte, set it on the bushing against the stop. Screw in the protec-
tive bushing.
Cable bushing
Protective bushing
Bushing
Remove
Syringe
filled with
electrolyte
Membrane assembly
Case
Capron thread
Teflon film
Membrane
а
Remove