![VOZROZHDENIE OXGARD CUBE C-05 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/vozrozhdenie/oxgard-cube-c-05/oxgard-cube-c-05_installation-manual_1052317006.webp)
VZR.2515.001IM
CUBE C-05 tripod turnstile
Installation Manual
6
3
PREPARING THE PRODUCT FOR INSTALLATION
3.1 Procedure for transporting the product to the installation place
The product in the original package can be transported without range
limitation by air, enclosed road and rail transport provided it is protected against
direct exposure to precipitation and dust.
In order to avoid moisture condensation after transportation at subzero
temperatures, the product shall be pre-held in a room with normal climatic
conditions for 12 hours.
Loading and unloading operations should be carried out in compliance with
safety regulations.
3.2 Rules for unpacking the product
3.2.1
Perform visual inspection of the packaging. There should be no
visible damage on the package.
3.2.2
Open the transportation box, unpack and check completeness of
the product:
1)
turnstile stand;
2)
CP with cable;
3)
base cover.
4)
barrier arms
3.3 Rules for visual inspection of the product
3.3.1
Check completeness of the product.
Completeness shall be checked according to the Logbook VZR.2515.001 LB.