VZR.2515.001IM
CUBE C-05 tripod turnstile
Installation Manual
14
4.2.4
– cable routing is exercised through hole (1) at the
lower turnstile stand plate.
4.2.5
Lay the CP connection cable, PSU cable and, if provided, the
ACS and SFAS cables in the cable conduit or chase.
4.2.6
Install the turnstile stand onto the prepared site.
4.2.7
Insert cables from the CP, PSU, ACS and SFAS cables into the
turnstile housing, after passing them into the turnstile stand. Secure the cables
with cable ties.
4.2.8
Align the holes in the turnstile stand with the floor anchors
– 1).
Check turnstile verticality in 2 planes, if necessary, use steel shims of
required thickness for the turnstile correct installation.