De-stoning machine EP 1000
Version: 136401000_M0014772F_EN400/50D
Datum: 15.01.2021
- 15 / 40 -
3
Transportation and setting up of the machine/line
3.1 Notes on transportation
NOTE!
- Before transporting the machine/line the motor is to be switched off and the
mains connector plug must be pulled out!
- The machine/line must not be tipped!
- In order to avoid transportation damage assemble any available
transport securing devices.
- Secure the machine/line in an orderly manner on the means of transport!
- Observe the statutory requirements (StVO) for legally specified dimensions
or mark the load!
Picture 3.1-1) Transportation De-stoning machine EP1000
F1 loading of the fork
250 kg
F2 foundation load
1100 N/m² or 110 kg/m²
1
transport pallet
2
Marker arrow for location points
WARNUNG VOR ALLGEMEINER GEFAHR
A forklift or crane with a lift capacity matched to the above table is necessary for unloading the
machine.