3
1
(continued)
1a
For 60 and 90-minute applications, install metal edge
wrap.
1b
If necessary, prepare door for top strike cutout.
⁵⁄₈
"
Cut out material
this side only
Latch
Push side of door, RHR shown
2"
1
³⁄₁₆
"
1c
With door laying flat, draw horizontal device center
line (
CL
).
RHR shown
(LHR opposite)
NOTE:
Centerline is
predetermined by cutout.
!
1d
If necessary, align plastic template to mark 4 holes.
Plastic
Template
1e
Prepare center case mounting holes as required.
Sex Bolts or 990 Trims
¹³⁄₃₂
"
Trim side
⁵⁄₁₆
"
Device side
Surface Mount
¹⁄₈
" Drill
Pilot 1
¹⁄₂
" Deep
OR
1f
Prepare center slide mounting hole.
Ø
³⁄₈
"
Push side
only
1⁷⁄₈
"
Push side of door, RHR shown
(LHR opposite)
Device
1
"
Device