25
Other items to check during opening
procedures
These steps do not necessarily need to be
performed as part of the daily opening
procedures. The following is a list of areas to
check on the Flavor Burst
®
system during
opening procedures. These areas should be
checked and adjusted if necessary.
1. Ensure that the sanitizer tank has plenty of
sanitizer solution that is no older than 28
days. Refill if necessary.
2. Ensure that desired flavors are installed and
that none of the flavor bags are empty.
Replace flavors according to instructions if
necessary.
3. Ensure that the flavor level and the multi-
flavored timing are set to a desired level.
Make adjustments according to instructions
according to the operator’s preference.
Содержание STL-80SS
Страница 2: ......
Страница 9: ...6 PAGE INTENTIONALLY LEFT BLANK ...
Страница 11: ...8 General System Overview Figure 1 ...
Страница 13: ...10 Cabinet Continued Figure 2 ...
Страница 17: ...14 Syrup Pump and Related Parts Figure 4 ...
Страница 19: ...16 Sanitizer Pump and Related Parts Figure 5 ...
Страница 23: ...20 Spare Parts Kit Figure 7 ...
Страница 24: ...21 PAGE INTENTIONALLY LEFT BLANK ...
Страница 36: ...33 PAGE INTENTIONALLY LEFT BLANK ...
Страница 50: ...47 PAGE INTENTIONALLY LEFT BLANK ...
Страница 73: ......
Страница 74: ......