*AllinstallationsinEnglandandWalesmustbenotifiedtoLocalAuthorityBuildingControl(LABC)eitherdirectlyorthrougha

CompetentPersonsScheme.ABuildingRegulationsComplianceCertificatewillthenbeissuedtothecustomer.

www.centralheating.co.uk

© Heating and Hotwater Industry Council (HHIC)

This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating 

compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.

Failure to install and commission according to the manufacturer’s instructions and complete this Benchmark Commissioning Checklist will invalidate the 
warranty. This does not affect the customer’s statutory rights.

GAS BOILER SYSTEM COMMISSIONING CHECKLIST

Customer name:

Telephone number:

Address:
Boiler make and model:
Boiler serial number:
Commissioned by (PRINT NAME):

Gas Safe register number:

Company name:

Telephone number:

Company address:

Commissioning date:

To be completed by the customer on receipt of a Building Regulations Compliance Certificate*

Building Regulations Notification Number (if applicable):

CONTROLS

 (tick the appropriate boxes)

Time and temperature control to heating

Room thermostat and programmer/timer

Programmable room thermostat

Load/weather compensation

Optimum start control

Time and temperature control to hot water

Cylinder thermostat and programmer/timer

Combination Boiler

Heating zone valves

Fitted

Not required

Hot water zone valves

Fitted

Not required

Thermostatic radiator valves

Fitted

Not required

Automatic bypass to system

Fitted

Not required

Boiler interlock

Provided

ALL SYSTEMS

The system has been flushed and cleaned in accordance with BS7593 and boiler manufacturer’s instructions

Yes

What system cleaner was used?
What inhibitor was used?

Quantity                             litres

Has a primary water system filter been installed?

Yes

No

CENTRAL HEATING MODE 

measure and record:

Gas rate

m³/hr

OR

ft³/hr

Burner operating pressure (if applicable)

mbar

OR

 Gas inlet pressure

mbar

Central heating flow temperature

°C

Central heating return temperature

°C

COMBINATION BOILERS ONLY

Is the installation in a hard water area (above 200ppm)?

Yes

No

If yes, and if required by the manufacturer, has a water scale reducer been fitted?

Yes

No

What type of scale reducer has been fitted?

DOMESTIC HOT WATER MODE

 Measure and Record:

Gas rate

m³/hr

OR

ft³/hr

Burner operating pressure (at maximum rate)

mbar

OR

 Gas inlet pressure at maximum rate

mbar

Cold water inlet temperature

°C

Hot water has been checked at all outlets

Yes

Temperature

°C

Water flow rate

I/min

CONDENSING BOILERS ONLY

The condensate drain has been installed in accordance with the manufacturer’s instructions and/or BS5546/BS6798

Yes

ALL INSTALLATIONS

Record the following:

At max. rate:                                 CO                             ppm

AND

CO/CO

²                             Ratio

At min. rate: (where possible)       CO                             ppm

AND

CO/CO

²                             Ratio

The heating and hot water system complies with the appropriate Building Regulations

Yes

The boiler and associated products have been installed and commissioned in accordance with the manufacturer’s instructions

Yes

The operation of the boiler and system controls have been demonstrated to and understood by the customer

Yes

The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer

Yes

Commissioning Engineer’s Signature
Customer’s Signature
(To confirm satisfactory demonstration and receipt of manufacturer’s literature)

www.centralheating.co.uk

Содержание Vibe 20 A G.C. N 41-094-84

Страница 1: ...NS TO BE RETAINED BY USER Vok ra is a licensed member of the Benchmark scheme which aims to improve the standards of installation and commissioning of domestic hot water systems in the UK Vibe High ef...

Страница 2: ...8 Mounting on a combustible surface 11 3A 9 Timber framed buildings 11 3A 10 Inhibitors 11 3A 11 Declaration of conformity 11 Installation Page 4 1 Delivery 12 4 2 Contents 12 4 3 Unpacking 12 4 4 Pr...

Страница 3: ...er has been designed to meet and exceed the very latest standards in gas central heating technology and if cared for will give years of reliable use and efficiency Please therefore take some time to r...

Страница 4: ...ating temperature selector move the selector clockwise to increase the heating outlet temperature or counter clockwise to reduce the tem perature range 40 C 80 C for standard central heating The autom...

Страница 5: ...t simultaneously 2 6 AUTOMATIC TEMPERATURE CONTROL The automatic temperature control function SARA permits the boiler when the heating temperature selector is set within 4 and 6 sector to automaticall...

Страница 6: ...I NEED TO CALL AN ENGINEER Ifyouthinkyourboilermayhavedevelopedafault pleasecontact yourinstallerorVok raCustomerServices 08443910999 UK or 056 7755057 ROI have all your details to hand including ful...

Страница 7: ...e ap plications These appliances are designed for use with a sealed system only consequently they are not intended for use on open vented systems This booklet is an integral part of the appliance It i...

Страница 8: ...bytheelectroniccircuittoensureflamestability at the burner Once successful ignition has been achieved the electronic circuitry increases the gas rate to 75 for a period of 15minutes Thereafter theboil...

Страница 9: ...Dry weight kg 26 28 2 5 Clearances Vibe 20A Vibe 25A Sides 12mm Top 150mm from casing or 25mm above flue elbow whichever is applicable Bottom 150mm Front 600mm 2 6 Connections Vibe 20A Vibe 25A Flow...

Страница 10: ...wall 300 mm P From a structure to the side of the vertical terminal 300 mm Q From the top of the vertical terminal to the roof flashing As determined by the fixed collar of the vertical terminal R To...

Страница 11: ...an unusually high water content it may be necessary to provide additional expansion capacity see 6 18 3 6 6 FILLING POINT A method for initial filling of the system and replacing water lost during ser...

Страница 12: ...is no requirement for a sheet of fireproof material to protect the wall 3 9 TIMBER FRAMED BUILDINGS If the appliance is to be fitted in a timber framed building it shouldbefittedinaccordancewiththeIns...

Страница 13: ...omplies with the local water authority regulations 3A 6 7 LOW PRESSURE SEALED SYSTEM An alternative method of filling the system would be from an independent make up vessel or tank mounted in a positi...

Страница 14: ...e see 2 9 Areduction must also be made to the maximum length see table below when additional bends are used Reduction for additional bends Bend Reduction in maximum flue length for each bend 45 bend 1...

Страница 15: ...ING THE REAR FLUE fig 14 rear flue outlet only Using the template provided mark and drill a 125mm hole for the passage of the flue pipe The hole should be drilled LEVEL to ensure any condense fluid th...

Страница 16: ...rminal 1 0 metre 359 Twin adapter kit N A 531 Pitched roof flashing plate N A 532 Flat roof flashing plate N A 0225815 Condensate drain kit N A 0225820 0 25m extension pair 50mm 0225825 0 5m extension...

Страница 17: ...iance flue outlet Remove the blanking plate located to the left of the appliance flue outlet and using the same screws install the air inlet plate B Using the hole in the exhaust connection manifold a...

Страница 18: ...e wire to NEUTRAL supply green yellow to EARTH connection Insertthesupplied3 AMPfuseintothefusedisolatororfusedplug Should the fly lead be unsuitable refer to 4 7 3 for details on how to connect the e...

Страница 19: ...nce service valves are open 5 6 INITIAL LIGHTING Ensure the electrical supply to the appliance is switched on Ensure any external controls are switched to an ON position and are calling for heat Move...

Страница 20: ...ilure to install and com mission the appliance to the manufacturers instructions will invalidate the warranty 5 13 INSTRUCTING THE USER Hand over all documentation supplied with this appliance includi...

Страница 21: ...from the pump assembly and remove the AAV assembly J Replace in the reverse order 6 7 1 TOP AUTOMATIC AIR RELEASE VALVE fig 29 Carry out component removal procedure as described in 6 4 Remove the AAV...

Страница 22: ...tly ease the fan assembly out of its location Once the assembly has been removed the burner K1 can be withdrawn from the heat engine Ensure the seals L1 is in good condition taking care to ensure it i...

Страница 23: ...s described in 6 4 Remove the locking pin Q1 that secures the cover R1 to the hydraulic manifold Using a hooked piece of wire carefully withdraw the by pass cartridge S1 Ensure all seals are in good c...

Страница 24: ...the ignition sequence com mences Ignition is sensed by the electronic circuit to ensure flame stability at the burner Once successful ignition has been achieved the electronic circuitry increases the...

Страница 25: ...it the plug fig 40 L2 and move the mode selector through position Remove the test probe from the test point and refit the sealing screw s and or cap IMPORTANT A GAS TIGHTNESS CHECK MUST BE CARRIED OUT...

Страница 26: ...as failed but no fault is in dicated a detailed continuity check will be required to trace the fault A visual inspection of components may also assist in locating the fault 7 7 3 POLARITY CHECK With t...

Страница 27: ...LICATIONS The appliance can be used with the following controls twin channel programmers The appliance can be used in conjunction with typical S Plan systems and Y Plan systems Please contact Vokera t...

Страница 28: ...sed JP5 Selection operating only heating JP6 Unused JP7 Unused JP8 Closed Unused LED Led 1 green working status or temporary stop Led 2 yellow CO 2 function ON Led 3 red boiler lock out brown CN3 blue...

Страница 29: ...INSTALLATION The entire installation including the meter must be purged and checked for gas tightness 9 6 2 GAS VALVE MAXIMUM SETTING Set the CO button at maximum see 10 3 1 once the maximum is obtai...

Страница 30: ...TO MINIMUM RATE In accordance with section 7 3 set boiler to operate at minimum rate to minimum load condition Allow sufficient time for combustion to stabilise YES Is CO 350ppm and CO CO2 ratio less...

Страница 31: ...commissioning checklist completed in full To instigate the boiler guarantee the boiler needs to be registered with the manufacturer within one month of the installation To maintain the boiler guarante...

Страница 32: ...nterlock Provided ALL SYSTEMS The system has been flushed and cleaned in accordance with BS7593 and boiler manufacturer s instructions Yes What system cleaner was used What inhibitor was used Quantity...

Страница 33: ...egister No Record At max rate CO ppm AND CO At min rate Where Possible CO ppm AND CO Comments Signature SERVICE 04 Date Engineer name Company name Telephone No Gas safe register No Record At max rate...