12
For more detailed information see points
7.3and 16.
7.9.1. Calculation
of
thermal power and average
hourly consumption
The calculation of the thermal power required
for heating a given space can be performed
using a very simple method, since, on average,
the heating power required for a properly
insulated room is approximately 40 W/m
3.
If we want to heat a space with 100m
3
then
we have:
100m
3
x 40W/m
3
= 4000 W, that is, 4 kW.
For this main heating requirement, a 6.5 kW
appliance will therefore suffice.
For poor thermal insulation consider 50 W/m3.
To find out more about the heating needs of a
home, check out our simulator at:
https://tekbiomasse.com/simulador/
8.
U
SE OF THE BOILER
Watch videos on using and maintaining your
boiler at
Useful information
Fuel used: see point 5- Fuel.
In order to avoid the risk of fire, you must
comply with the instructions in point 2.2, with
special emphasis
on the following aspects:
•
It is forbidden to place clothes to
dry
or other objects on the equipment
or in its proximity that block the free
circulation of air;
•
Clean the equipment
only when it is
completely
cold and turned off;
•
The ash compartment
must not be
opened
while the boiler is operating.
Wait for it to stop and cool down
completely to clean the ash.
Simultaneous use with other ventilation
systems: see point 9- Installation constraints.
Safeguarding the safety distance from
combustible materials: see point 10- Boiler
installation site.
Air supply and smoke evacuation: see points
7.4 - Air intake and 7.5 - Smoke evacuation
duct.
If a fire occurs in the equipment or chimney,
you must:
•
Immediately turn off the equipment;
•
Do not open any equipment door;
•
Do not use water to put out the fire;
•
Putting out the fire using a CO2
extinguisher
•
Request the intervention of the fire
department.
See terms of legal warranty and spare parts in
points:
3and
Ignition
Ignition can only be carried out with the
brazier
EMPTY
of pellets and/or ash.
The boiler is switched on by pressing the
ON/OFF key for 3s.
The word “
Chec
” will appear on the display
until ignition is complete. This process will take
an average of 5 to 12 min. Once completed,
the ignition will move to a flame stabilization
phase and, finally, it will enter the previously
selected power level or what was in use when
the boiler was last turned off.
User can select 5 power levels.
Stop
Stopping is carried out by pressing the ON/OFF
key for 3s. The word “Deactivation” will appear
on the display. The feeding of pellets will be
stopped, and the room and smoke extraction
fans will be activated to guarantee the
complete burning of all the material until the
boiler temperature is reduced to 40ºC.
Содержание TEK Biomasse PIKO
Страница 1: ...TEK Biomasse 2022 NG01 EN220705 Instruction Manual Pellet Compact Boiler PIKO ...
Страница 41: ...41 13 ELECTRIC SCHEME ...
Страница 46: ...46 15 DIMENSIONS OF CONNECTIONS ...