5
CHAPTER 1: MAINTENANCE PROCEDURE
1.2 Cleaning the Grooves
If there is any dust in the grooves of the Poly-V belts and pulleys, noises will be generated during operation.
Frequency: Every 3 to 4 months.
[Procedure]:
1. Remove the Poly-V belts (360-J6, 380-J8) and check the grooves of the belt for dirt or dust and clean if any is present.
2. Check the grooves in the pulley for dirt or dust and clean if any is present.
3. Check the grooves in the roller pulley for dirt or dust and clean if any is present.