background image

30

For Vertical Terminations -

 To locate the vent and in-

stall the vent sections:

• Locate and mark the vent centerpoint on the underside

of the roof, and drive a nail through the centerpoint.

• Make the outline of the roof hole around the centerpoint

nail.

• The size of the roof hole framing dimensions depend on

the pitch of the roof. There 

MUST BE

 a 1-inch (25.4mm)

clearance from the vertical vent pipe to combustible ma-
terials.

• Mark the roof hole accordingly.

• Cover the opening of the installed vent pipes.

• Cut and frame the roof hole.

• Use framing lumber the same size as the roof rafters

and install the frame securely. Flashing anchored to the
frame must withstand heavy winds.

• Continue to install concentric vent sections up through

the roof hole and up past the roof line until you reach
the appropriate distance above the roof.

WARNING:  MAJOR U.S. BUILDING
CODES SPECIFY MINIMUM CHIMNEY

AND/OR VENT HEIGHT ABOVE THE ROOF TOP.
THESE MINIMUM HEIGHTS ARE NECESSARY IN
THE INTEREST OF SAFETY. SEE THE FOLLOW-
ING DIAGRAM FOR MINIMUM HEIGHTS, PROVID-
ED THE TERMINATION CAP IS AT LEAST TWO
(2) FEET FROM A VERTICAL WALL AND 2-FEET
BELOW A HORIZONTAL OVERHANG.

NOTE: This also pertains to vertical vent systems in-
stalled on the outside of the building.

!

Roof Pitch

H (min.) ft.

flat to 6/12

1.0

6/12 to 7/12

1.25

over 7/12 to 8/12

1.5

over 8/12 to 9/12

2.0

over 9/12 to 10/12

2.5

over 10/12 to 11/12

3.25

over 11/12 to 12/12

4.0

over 12/12 to 14/12

5.0

over 14/12 to 16/12

6.0

over 16/12 to 18/12

7.0

over 18/12 to 20/12

7.5

over 20/12 to 21/12

8.0

Figure 32.   Minimum Height from Roof to
                   Lowest Discharge Opening

To seal the roof hole, and to divert rain and snow from the
vent system:

• Attach a flashing to the roof using nails, and use a non-

hardening mastic around the edges of the flashing base
where it meets the roof.

• Attach a storm collar over the flashing joint to form a

water-tight seal. Place non-hardening mastic around the
joint, between the storm collar and the vertical pipe.

• Slide the termination cap over the end of the vent pipe

and rotate the pipe clockwise 1/4 turn.

HORIZONTAL

OVERHANG

VERTICAL

WALL

TERMINATION

CAP

12

X

ROOF PITCH

IS  X/ 12

LOWEST

DISCHARGE

OPENING

H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING

2 FT.

MIN.

2 FT. MIN.

Содержание QV32

Страница 1: ...LIANCE FOR FUTURE REFERENCE 1 This appliance may be installed in an af termarket permanentlylocated manufac tured mobile home where not prohibit ed by local codes 2 This appliance is only for use with...

Страница 2: ...DERSTAND all instructions carefully before starting the installation FAILURE TO FOLLOW these installation instructions may result in a possible fire hazard and will void the warranty Prior to the firs...

Страница 3: ...nstalling Vent Components 26 C Vent Termination 28 Step 4 Positioning Leveling and Securing the Fireplace 31 Step 5 The Gas Control Systems 31 Step 6 The Gas Supply Line 32 Step 7 Gas Pressure Require...

Страница 4: ...Installers Guide have been tested to certification standards and listed by the applicable laboratories Certification MODELS QV32 QV36 LABORATORY Underwriters Laboratories TYPE Direct Vent Gas Firepla...

Страница 5: ...re to follow these instructions will void the owner s warranty and may present a fire hazard The Quadra Fire Warranty will be voided by and Aladdin Hearth Products disclaims any responsibility for the...

Страница 6: ...61mm 30 3 4 780mm 15 3 8 390mm 15 3 4 402mm 36 917mm 41 1040mm 3 1 2 90mm 8 198mm ELECTRICAL ACCESS 26 7 8 682mm 8 5 8 219mm 6 5 8 168mm 16 1 4 415mm 8 3 4 223mm 1 2 14mm 24 610mm 34 1 2 879mm HEAT SH...

Страница 7: ...mm 16 1 4 415mm 1 2 14mm 32 1 2 827mm 2 1 4 55mm 5 1 16 129mm GAS LINE ACCESS 31 790mm 36 913mm 3 1 2 90mm 8 198mm ELECTRICAL ACCESS 23 3 8 593mm 8 5 8 219mm 6 5 8 168mm 20 1 2 521mm 31 789mm HEAT SHI...

Страница 8: ...structing the Fireplace Chase A chase is a vertical box like structure built to enclose the gas fireplace and or its vent system Vertical vents that run on the outside of a building may be but are not...

Страница 9: ...raming should be constructed of 2 X 4 lumber or heavier The framing headers may rest on the fireplace stand offs The center of the framing hole is one 1 inch 25 4mm above the center of the horizontal...

Страница 10: ...2mm 11 3 4 298mm DV 48D 7 3 8 187mm 6 5 32 156mm 11 5 8 295mm 8 5 8 220mm 8 1 2 216mm 6 7 16 164mm 11 1 16 281mm 6 1 2 165mm 8 1 2 216mm 5 1 16 129mm 8 5 8 220mm 35 3 4 908mm DV 12 17D 12 17 305 432mm...

Страница 11: ...nner pipe 6 5 8 inch outer pipe 120 3048mm 24 610mm 36 914mm 60 1524mm 9 1 4 6 5 8 6 1 2 6 3 8 6 1 2 9 5 8 9 5 8 6 5 8 6 3 8 8 3 4 SL 09D 12 17 SL 12 17D SL12 17D SL 24D SL 36D SL 48D 47 3 4 35 3 4 23...

Страница 12: ...D SL D SERIES COMPONENTS IN ANY VENT SYSTEM CONFIGURATION Identifying Vent Components Approved vent system components are labeled for identi fication NO OTHER VENTING SYSTEMS OR COMPO NENTS MAY BE USE...

Страница 13: ...tion in total H when using flex vent except when using the simple up and out installation see Figure 9 Figure 9 Flex Vent The flex vent must be supported with the spacing between support intervals not...

Страница 14: ...MAX 40 FT 12 2m MODEL QV36 2 5 FT 863mm 3 FT 914mm 4 FT 1 22m 6 FT 1 86m 8 FT 2 48m 16 FT 4 8m MODEL QV32 V MIN H MAX 90o Elbow on Top 2 5 FT 863mm 1 FT 305mm 2 5 FT 863mm 2 FT 610mm 4 FT 1 22m 3 FT 9...

Страница 15: ...2 48 m H H1 16 MAX 4 8m Figure 14 Venting with Two 90 Elbows V FT H H1 FT 1 MIN 305 mm 2 MAX 610 mm 2 MIN 610 mm 4 MAX 1 22 m 3 MIN 914 mm 6 MAX 1 86 m 4 MIN 1 22 m 8 MAX 2 48 m H H1 8 MAX 2 48 m V H...

Страница 16: ...T 914mm 4 FT 1 22m 6 FT 1 86m 8 FT 2 48m 16 FT 4 8m MODEL QV32 V MIN H H1 MAX 90o Elbow on Top 2 5 FT 863mm 1 FT 305mm 2 5 FT 863mm 2 FT 610mm 4 FT 1 22m 3 FT 914mm 6 FT 1 86m 4 FT 1 22m 8 FT 2 48m 5...

Страница 17: ...2m 6 FT 1 86m 8 FT 2 48m 16 FT 4 8m MODEL QV32 V MIN H MAX 90o Elbow on Top 2 5 FT 863mm 1 FT 305mm 2 5 FT 863mm 2 FT 610mm 4 FT 1 22m 3 FT 914mm 6 FT 1 86m 4 FT 1 22m 8 FT 2 48m 5 FT 1 52m 16 FT 4 8m...

Страница 18: ...H1 16 MAX 4 8m V H H H1 1 MIN 305 mm 2 MAX 610 mm 4 MAX 1 22m 2 MIN 610 mm 4 MAX 1 22 m 8 MAX 2 48m 3 MIN 914 mm 6 MAX 1 86 m 12 MAX 3 72m 4 MIN 1 22 m 8 MAX 2 48 m 16 MAX 4 8m V H H1 H2 40 MAX 12 4...

Страница 19: ...TING WITH THREE 3 90o ELBOWS NATURAL GAS V H V1 H1 MAX 40 FT 12 2m VENTING WITH THREE 3 90o ELBOWS PROPANE MODEL QV32 MODEL QV36 V MIN H MAX H H1 MAX H MAX H H1 MAX 90o Elbow on Top 2 5 FT 863mm 5 FT...

Страница 20: ...2 5 FT 863mm 3 FT 914mm 4 FT 1 22m 6 FT 1 86m 8 FT 2 48m 16 FT 4 8m MODEL QV32 V MIN H H1 MAX 90o Elbow on Top 2 5 FT 863mm 1 FT 305mm 2 5 FT 863mm 2 FT 610mm 4 FT 1 22m 3 FT 914mm 6 FT 1 86m 4 FT 1 2...

Страница 21: ...NATURAL AND PROPANE GAS V MIN H MAX 2 609mm 5 1 52m V1 MIN H1 MAX V2 MIN 5 1 52m 5 1 52m 4 5 1 37m V V1 V2 H H1 MAX 40 12 2m V H V2 V1 H1 NOTE There MUST be a 25 reduction in total H when using flex...

Страница 22: ...Out Top WARNING THE REAR VENT COLLAR SEAL CAP MUST REMAIN ATTACHED TO THE REAR VENTCOLLARSIFTHEVENTSYSTEMISATTACHED TO THE TOP STARTING COLLARS SEE FIGURE 21 WARNING FAILURE TO REMOVE INSULA TION IN T...

Страница 23: ...ther interior or exterior walls Cut a 12 x 12 305mm x 305mm hole through the wall for D series or a 10 x 10 254mm x 254mm hole for SL D series pipe The center of the framing hole is one 1 inch 25 4mm...

Страница 24: ...9 Attic Firestop JOIST CEILING FIRESTOP CEILING NAILS 4 REQUIRED CEILING CEILING FIRESTOP RAFTER NAILS 4 REQUIRED CEILING NEW FRAMING MEMBERS EXISTING CEILING JOISTS CHIMNEY HOLE 11 280 mm or 10 254 m...

Страница 25: ...RONGLY RECOMMENDED WHENEVER POSSIBLE TO USE THE VINYL PROTECTOR KIT 30 minimum for vinyl clad soffits a vent shall not terminate directly above a sidewalk or paved driveway which is located between tw...

Страница 26: ...MUM HEIGHTS PROVID ED THE TERMINATION CAP IS AT LEAST TWO 2 FEET FROM A VERTICAL WALL AND 2 FEET BELOW A HORIZONTAL OVERHANG NOTE This also pertains to vertical vent systems in stalled on the outside...

Страница 27: ...oning Leveling and Securing of a Fireplace Figure 34 Gas Control System STANDING PILOT Step 5 The Gas Control Systems WARNING THIS UNIT IS NOT FOR USE WITH SOLID FUEL The gas control system used with...

Страница 28: ...diameter and it does not penetrate the actual firebox Open the fireplace lower grille insert the gas supply line through the gas line hole and connect it to the shut off valve When attaching the pipe...

Страница 29: ...installed Wall Switch Position the wall switch in the desired position on a wall Run a maximum of 25 feet 7 8 m or less length of 18 A W G minimum wire and connect it to the fireplace ON OFF switch p...

Страница 30: ...DE SEAL JOINT 0 1 4 FINISH MATERIAL MAY BE COMBUSTIBLE TOP AND SIDES OF UNIT Optional Accessories Optional fan and remote control kits require that 110 120 VAC be wired to the fireplace junction box W...

Страница 31: ...ANSI Z97 1 1984 and CPSC 16 CFR 1202 Safety Glazing Certification Council SGCC 1595 and 1597 Architec tural Testing Inc Reports 02 31919 01 and 02 31917 01 This statement is in compliance with CPSC 16...

Страница 32: ...r If it is necessary to access the pilot remove the trim door and glass door THERMOCOUPLE PILOT THERMOPILE 5 To put the control in the PILOT position turn the control knob counter clockwise to the PIL...

Страница 33: ...the gas supply lines When first lighting the fireplace it will take a few minutes for the lines to purge themselves of this air Once the purging is complete the fireplace will light and will operate...

Страница 34: ...urrounding the logs Checking Flame Patterns Flame Height Frequency Periodically By Qualified service technician Home owner Task Make a visual check of your fireplace s flame patterns Make sure the fla...

Страница 35: ...the pilot and hold the valve knob in If the millivolt reading is less than 15mV replace the thermocouple b Defective valve If the thermocouple is producing more than 15 millivolts replace faulty valve...

Страница 36: ...downwards lope is 1 4 inch d Glass too loose and air tight packet leaks in corners after usage Tighten the corner e Bad thermopile or thermocouple Replace if necessary f Improper vent cap installation...

Страница 37: ...ning and temporary repairs do not qualify for a service call fee and will not be covered The replacement of consumer replaceable items and installation of upgraded component parts do not quality for a...

Отзывы: