![Viessmann VITOVENT 300 Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/viessmann/vitovent-300/vitovent-300_service-instructions-for-contractors_1017789028.webp)
Cleaning the ventilation air apertures and extract air valves
1.
Light contamination:
Wipe the outside air and extract air
valves with a damp cloth.
2.
Heavy contamination:
&
Dismantle the outside air and
extract air valves
&
Wet-clean the outside air and
extract air valves and refit them.
Starting the system and checking its functions
Frost protection function
As protection against icing up, the
frost protection function prevents the
secondary side (extract air side) of
the countercurrent heat exchanger
from freezing as a result of the con-
densate that is created.For this, the
outside and extract air flow are regu-
lated subject to the outside air tem-
perature and the pressure at the heat
exchanger. Initially, the outside air
flow rate is reduced to defrost the
heat exchanger.
Subject to the thickness of the ice, the
extract air flow rate can be stopped
completely. In regular short intervals
the PCB checks whether the ventila-
tion fan can be restarted. An electric
pre-heater bank (accessory) or a
geothermal heat exchanger (on-site
provision) is required if the activation
of the frost protection function is to be
prevented. This applies particularly to
passive houses.
Simultaneous operation with open flue combustion equipment
For this, the frost protection function
must be assured through an electric
pre-heater bank (accessory) or a
geothermal heat exchanger (on-site
provision). Nevertheless, the Vitovent
(see page 6 and technical guide) must
still be interlocked in both cases.
Further details regarding the individual steps
(cont.)
28
Commissioning, inspection, maintenance
5692
762
GB
Содержание VITOVENT 300
Страница 44: ...Version 180 m3 h Parts list cont 44 Parts list 5692 762 GB...
Страница 46: ...Version 300 and 400 m3 h Parts list cont 46 Parts list 5692 762 GB...
Страница 47: ...List of control parameters 47 Commissioning service reports 5692 762 GB...
Страница 48: ...Commissioning report example 48 Commissioning service reports 5692 762 GB...