5
5797 340 - 01
Vitoflex 300-RF Installation & Operating
Table of Contents
Mechanical
(continued)
Operation
Parameters
Further Settings
Electrical
Operation
Page
Fire Extinguishing Systems
.......................................36
Assembly of the Fire Extinguishing Systems
.................37
Control Panel
............................................................38
Mounting of the control panel................................38
Electrical
connection.............................................38
General
safety
instructions....................................38
Appliance Description...
.............................................39
Operating States
.......................................................41
Programming Unit...
..................................,,,,,,..........42
Default Display
.........................................................43
Manual Mode and Calling up Further Information
..........46
Parameters
...............................................................46
Menu..
....................................................................46
Information on Starting Up/Shutting Down
...................47
Starting Up
..............................................................47
Shutting Down..
.......................................................47
Parameter Level
........................................................48
Charging..
................................................................48
Secondary Air
...........................................................54
Flow
.......................................................................55
Flue Gas Fan
............................................................57
Buffer Tank
..............................................................58
Boiler 2
....................................................................59
DHW Circulation 1
....................................................60
DHW Tank 2...
...........................................................61
Heating Circuit 3
.......................................................62
Cleaning the Touchscreen
...........................................63
Setting the Language
.................................................63
Designating Heating Circuits
.......................................63
Parameter Set Management
........................................64
IP Settings..
..............................................................65
User Administration
...................................................66
Diagrams
.................................................................67
Shutting Down the Heating System for an Extended
Period
.....................................................................69
Sub-area Screens for the Boiler
...................................70
Sub-area Screens for the Auxiliary Systems
..................71
Sub-area Screens for the heat Distribution
...................74
Boiler Wiring
.............................................................75
Commissioning
.........................................................76
Initial
start
up......................................................76
Filling the heating system......................................76
Fuel for the commissioning....................................76
Commissioning
and handover................................76
Filling the Fuel Storage Unit
.......................................77
By
dumping.........................................................77
By
blowing
In......................................................77
Fixing
malfunctions
in
the feed system....................77
Excess Conditions
.....................................................78
Excess
temperature/power failure...........................78
Low water/excess water pressure..........................78