98
Danger
Incorrect core allocation can
cause severe injuries and dam-
age to the appliance.
Never interchange cores "L" and
"N".
■ In negotiations with your power supply
utility, different supply tariffs for the
main power circuits may be offered.
Observe the technical connection
requirements of the power supply util-
ity.
■ If the compressor and/or instantane-
ous heating water heater (if installed)
are operated at an economy tariff
(power-OFF), provide an additional
cable (e.g. 3 x 1.5 mm
2
) for the power-
OFF signal from the distribution board
(meter box) to the heat pump control
unit.
■ The allocation of the power-OFF (for
compressor and/or instantaneous
heating water heater) is made via the
type of connection and by setting
parameters in the heat pump control
unit.
In Germany, the power supply can be
cut off for up to 3 x 2 hours per day
(24 h).
■ The
heat pump control unit/PCB
must be supplied
without
blocking by
the power supply utility; tariffs that are
subject to possible shutdown must not
be used here.
The power supply to the heat pump
control unit (3 x 1.5 mm
2
) and the cable
for the power-OFF signal can be com-
bined in a 5-core cable.
■ Protect the power supply to the heat
pump control unit with max. 16 A.
■ For accessories and external compo-
nents that are not to be connected to
the heat pump control unit, make the
power connection with the same
phase as the heat pump control unit;
we recommend using the same fuse/
MCB.
Connection to the same fuse/MCB
provides additional safety when the
power is switched off. Observe the
power consumption of the consumers
connected.
Information regarding the compres-
sor power supply
■ The compressor power fuses must
have B characteristics.
Heat pump control unit power supply (230 V~)
L1
X3.18
N
X2.1
?
X1.1
A
1/N/PE
230 V / 50 Hz
max.16 A
A
Mains terminals inside the heat
pump control unit
Note
This supply must never be blocked.
Installation sequence
Power supply
(cont.)
5692 875 GB
Содержание Vitocal 300 AWO-M-AC 301.A
Страница 5: ...5 Certificates Declaration of conformity 148 Keyword index 149 Index Index cont 5692 875 GB...
Страница 47: ...47 Installation sequence Removing the transport brackets cont 5692 875 GB Installation...
Страница 49: ...49 3x 9x 3 3x 3x 2 3 4 1 Installation sequence Fitting the outer panels cont 5692 875 GB Installation...
Страница 52: ...52 3x 3x 3x 3x 9 8 Installation sequence Fitting the outer panels cont 5692 875 GB...
Страница 53: ...53 3x 10 3x 2x 11 Installation sequence Fitting the outer panels cont 5692 875 GB Installation...
Страница 57: ...57 Type AWCI M AC 301 A 1 Installation sequence Siting the heat pump cont 5692 875 GB Installation...
Страница 58: ...58 Type AWO M AC 301 A 2 3 4 5 4x 1 Installation sequence Siting the heat pump cont 5692 875 GB...
Страница 104: ...104 Fitting the front panel 1 2 2 Installation sequence Closing the heat pump cont 5692 875 GB...
Страница 127: ...127 022 029 032 034 033 031 033 025 031 Parts lists Parts list type AWCI M AC 301 A cont 5692 875 GB Service...
Страница 128: ...128 051 052 008 066 038 063 064 Parts lists Parts list type AWCI M AC 301 A cont 5692 875 GB...
Страница 134: ...134 022 029 032 033 031 033 025 031 Parts lists Parts list type AWO M AC 301 A cont 5692 875 GB...
Страница 135: ...135 051 052 008 065 038 063 064 Parts lists Parts list type AWO M AC 301 A cont 5692 875 GB Service...