110
Equivalent to a static pressure of
1 bar.
3.
Top up with water until the filling pres-
sure exceeds the pre-charge pres-
sure of the expansion vessel.
On a cold system, the filling pressure
must be approx. 0.2 bar higher than
the static pressure.
4.
During commissioning, mark this
value on the pressure gauge as min-
imum filling pressure.
Checking the compressor casing temperature
1.
Switch ON the heat pump and oper-
ate it for at least 10 min.
2.
Measure the temperature of the com-
pressor casing exterior while it is in
operation.
The compressor must not develop a
layer of ice on its outside, and the
casing must not get hotter than
60 °C (if necessary, check with
Viessmann technical service).
Commissioning the system
Commissioning (configuration, parame-
ter settings and function checks) can be
carried out with or without the commis-
sioning assistant (see following chapter
and service instructions for the Vitotronic
200 heat pump control unit).
Note
Type and extent of parameters depend
on the heat pump type, on the selected
system scheme and the accessories
employed.
Commissioning with commissioning assistant
The commissioning assistant guides you
automatically through all the menus
where settings have to be made. For
this, "Coding level 1" is automatically
active.
!
Please note
Incorrect operation at "Coding
level 1" may result in damage to
the appliance and the heating
system.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5692 875 GB
Содержание Vitocal 300 AWO-M-AC 301.A
Страница 5: ...5 Certificates Declaration of conformity 148 Keyword index 149 Index Index cont 5692 875 GB...
Страница 47: ...47 Installation sequence Removing the transport brackets cont 5692 875 GB Installation...
Страница 49: ...49 3x 9x 3 3x 3x 2 3 4 1 Installation sequence Fitting the outer panels cont 5692 875 GB Installation...
Страница 52: ...52 3x 3x 3x 3x 9 8 Installation sequence Fitting the outer panels cont 5692 875 GB...
Страница 53: ...53 3x 10 3x 2x 11 Installation sequence Fitting the outer panels cont 5692 875 GB Installation...
Страница 57: ...57 Type AWCI M AC 301 A 1 Installation sequence Siting the heat pump cont 5692 875 GB Installation...
Страница 58: ...58 Type AWO M AC 301 A 2 3 4 5 4x 1 Installation sequence Siting the heat pump cont 5692 875 GB...
Страница 104: ...104 Fitting the front panel 1 2 2 Installation sequence Closing the heat pump cont 5692 875 GB...
Страница 127: ...127 022 029 032 034 033 031 033 025 031 Parts lists Parts list type AWCI M AC 301 A cont 5692 875 GB Service...
Страница 128: ...128 051 052 008 066 038 063 064 Parts lists Parts list type AWCI M AC 301 A cont 5692 875 GB...
Страница 134: ...134 022 029 032 033 031 033 025 031 Parts lists Parts list type AWO M AC 301 A cont 5692 875 GB...
Страница 135: ...135 051 052 008 065 038 063 064 Parts lists Parts list type AWO M AC 301 A cont 5692 875 GB Service...