58
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
1. Opening the heat pump
..................................................................................................... 59
•
2. Compiling reports
.............................................................................................................. 59
•
•
3. Checking the refrigerant circuit for leaks
........................................................................ 59
•
4. Filling and venting on the secondary side
....................................................................... 59
•
5. Filling and venting the DHW cylinder on the DHW side
................................................. 61
•
•
•
6. Checking the expansion vessel and heating circuit pressure
....................................... 61
•
•
•
7. Testing the anode connection
........................................................................................... 62
•
8. Measuring the anode earth current with an anode tester
.............................................. 62
•
9. Testing the protective magnesium anode
........................................................................ 63
•
10. Replacing the protective magnesium anode
................................................................... 63
•
11. Draining the appliance on the DHW side
......................................................................... 64
•
12. Cleaning the DHW cylinder
............................................................................................... 64
•
•
13. Checking the indoor unit electrical connections for firm seating
•
•
•
14. Checking that the fan in the outdoor unit can run freely
............................................... 65
•
15. Cleaning the outdoor unit heat exchanger (evaporator)
................................................ 66
•
•
16. Checking the outdoor unit electrical connections for firm seating
............................... 67
•
•
•
17. Closing the heat pump
....................................................................................................... 67
•
•
•
18. Switching on the power supply
........................................................................................ 67
•
•
•
19. Starting the heat pump
...................................................................................................... 67
•
20. Commissioning the system
............................................................................................... 68
•
•
•
21. Checking the heat pump for noise
................................................................................... 78
•
•
•
22. Checking the system function
.......................................................................................... 78
•
23. Instructing the system user
.............................................................................................. 78
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5831412
Содержание Vitocal 222-A
Страница 80: ...80 Fig 64 Maintenance Indoor unit Placing the control unit panel in its service position 5831412 Maintenance...
Страница 92: ...92 Maintenance Checking the fuses cont 5831412 Maintenance...
Страница 102: ...102 0004 0005 0001 0002 0003 0006 0007 Fig 74 Indoor unit parts lists Miscellaneous 5831412 Components...
Страница 104: ...104 Indoor unit parts lists Miscellaneous cont 5831412 Components...
Страница 112: ...112 Outdoor unit parts list 230 V types 221 A04 to A08 Outdoor unit electrical equipment 230 V cont 5831412 Components...
Страница 120: ...120 Outdoor unit parts list 230 V types 221 A10 to A16 Outdoor unit electrical equipment 230 V cont 5831412 Components...
Страница 154: ...154 5831412...
Страница 155: ...155 5831412...