64
1.
Open any non-return valves installed
on site.
2.
Check the pre-charge pressure of the
expansion vessel and top up if
required.
3.
Fill (flush) and vent the secondary cir-
cuit via an on-site connection.
F
E
D
C
Safety assembly supplied
C
Pressure gauge
D
Connection G¾
E
Quick-action air vent valve
F
Safety valve
4.
Check the system pressure at pres-
sure gauge
C
and top up with water
if required.
Minimum system pressure: 0.8 bar
(80 kPa)
Permiss. operating pressure: 3.0 bar
(0.3 MPa)
5.
Place the control panel in its service
position; see page 81.
6.
Open programming unit; see
page 79.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5782 176 GB
Содержание Vitocal 200-S
Страница 80: ...80 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5782 176 GB...
Страница 81: ...81 Placing the control panel in its service position 4x 1 3 2 Troubleshooting Repairs cont 5782 176 GB Service...
Страница 145: ...145 5782 176 GB...
Страница 146: ...146 5782 176 GB...
Страница 147: ...147 5782 176 GB...