15
8.
9.
180°
Fig. 7
8.
Dismantle gearwheel.
9.
Insert ash removal screw and pull out on the oppo-
site side of the boiler.
Note
After siting the boiler in its final position, refit the com-
ponents in reverse order.
Siting requirements
■
The specified wall clearances are required for instal-
lation and maintenance work.
■
The space above the boiler must remain free for
maintenance work.
■
Required room height: At least 2.1 m
Preparing for installation
Handling
(cont.)
5679249
Installation