12
3.
Fig. 2
3.
Lift boiler off the pallet using flexible sling gear
attached to the transport lug.
4.
Fig. 3
4.
Lift boiler off the pallet and transport to installation
location with pallet truck or forklift truck.
5.
Remove and retain the bag containing the boiler
type plate from the combustion chamber door.
Note
The type plate is later affixed to the left-hand or
right-hand casing panel.
6.
Remove the cleaning set from the boiler and keep
it safe.
Preparing for installation
Handling
(cont.)
5679249
Installation