34
Type
AWS/
AWS-AC
Line
Connection to
external unit
Torque in Nm
107
Liquid gas line
7
10 mm
⅝
UNF
33–42
Hot gas line
7
16 mm
⅞
UNF
63–77
110
Liquid gas line
7
10 mm
⅝
UNF
33–42
Hot gas line
7
16 mm
⅞
UNF
63–77
113
Liquid gas line
7
10 mm
⅝
UNF
33–42
Hot gas line
7
16 mm
⅞
UNF
63–77
Connection to the internal unit
2.
1.
3.
2x
D
C
D
C
D
C
C
Liquid gas line
D
Hot gas line
Installation sequence
Connecting the refrigerant lines
(cont.)
5724 152 GB
Содержание AWS 104
Страница 5: ...5 Certificates Declaration of conformity 119 Keyword index 120 Index Index cont 5724 152 GB...
Страница 86: ...86 Placing the control panel in its service position 4x 1 2 3 Troubleshooting Repairs 5724 152 GB...
Страница 87: ...87 Opening programming unit 3 2 1 2x Troubleshooting Repairs cont 5724 152 GB Service...
Страница 88: ...88 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5724 152 GB...
Страница 89: ...89 Removing separating plate 1 2 Troubleshooting Repairs cont 5724 152 GB Service...
Страница 98: ...98 101 300 104 231 100 232 230 105 103 103 300 A Parts lists Parts list internal unit cont 5724 152 GB...
Страница 106: ...106 622 614 643 670 642 615 616 637 640 639 669 Parts lists Parts list external unit type AWS AWS AC cont 5724 152 GB...