62
230 V/ 50 Hz
4
212.2
X2.N
X1.
UP A1
100 W
83
211.4
X2.N
X1.
7
M
1~
UPSB
212.3
X2.N
X1.
ZP
32
50 W
130 W
L3
N
L2
L1
137
2
3 / N / PE
400 V, 50 Hz
X2.N
211.3
224.4
16 A
211.2
X2.N
X1.
UP
6
STB
24
B
224.7
X2.N
X1.
UPSB
100 W
26
224.6
X2.N
X1.
130 W
36
33
66
M2
OPEN
CLOSE
X2.N
X1.
225.3
225.2
225.1
X2.N
X1.
UP M2
64
100 W
20
67
X2.N
X1.
222.4
222.3
X3.1
21
STB
25
C
D
22
OPEN
CLOSE
X2.N
X1.
222.2
222.1
136
211.1
X2.N
X1.
UP
200 W
5
211.5
X2.N
X1.
NC
70
A
X1.
X3.8
X3.9
73
15
SLP
130 W
M
1~
M
1~
M
1~
M
1~
M
1~
M
1~
X1.1
X2.1
X3.18
230 V / 50 Hz
N
L1
< 16 A
M
1~
M
1~
M
1~
M
1~
Preparing for installation
System example 3, ID: 4605352_1008_01
(cont.)
5609 667 GB
Содержание 7452609
Страница 68: ...68 Removing the top panel 1 Installation sequence Siting the heat pump cont 5609 667 GB...
Страница 125: ...125 Opening the casing door Troubleshooting Maintenance cont 5609 667 GB Service...
Страница 145: ...145 0017 0015 0012 0016 0013 0023 0022 0014 0024 Parts lists Electrical equipment type BWS cont 5609 667 GB Service...
Страница 183: ...183 5609 667 GB...