30
Hydraulic installation scheme
19
24
26
28
22
20
--2/X3.8;3.9--
--2/21
1.1;224.2--
27
---------
P1
P1
--2/X3.3;3.4--
23
21
--2/X3.8;3.9--
9
1
2
--KM BUS--
--X3.8;3.9--
--230V
--
P1
P1
P1
P1
--F2--
16
--F3--
17
--F2--
--21
1.1--
--F3--
--2/21
1.1--
15
--224.2--
P
Equipment required
Pos.
Description
1
Heat pump stage 1
2
Heat pump control unit
9
Heat pump stage 2
qT
Common primary pump
Preparing for installation
Primary circuit, type WW + BWS (2-stage,…
(cont.)
5609 667 GB
Содержание 7452609
Страница 68: ...68 Removing the top panel 1 Installation sequence Siting the heat pump cont 5609 667 GB...
Страница 125: ...125 Opening the casing door Troubleshooting Maintenance cont 5609 667 GB Service...
Страница 145: ...145 0017 0015 0012 0016 0013 0023 0022 0014 0024 Parts lists Electrical equipment type BWS cont 5609 667 GB Service...
Страница 183: ...183 5609 667 GB...