23
Hydraulic installation scheme
22
27
9
20
21
--2/X3.8;3.9--
1
2
--KM BUS--
--X3.8;3.9--
--230V
--
P1
P1
P1
P1
--F2--
16
--2/21
1.1--
--F3--
17
--F2--
--21
1.1--
--F3--
15
P
Equipment required
Pos.
Description
1
Heat pump stage 1
2
Heat pump control unit
9
Heat pump stage 2
qT
Common primary pump
qZ
Primary circuit flow temperature sensor (for installation, see page 94)
qU
Primary circuit return temperature sensor (for installation, see
page 94)
Preparing for installation
Primary circuit, type BW + BWS (2-stage,…
(cont.)
5609 667 GB
Installation
Содержание 7452609
Страница 68: ...68 Removing the top panel 1 Installation sequence Siting the heat pump cont 5609 667 GB...
Страница 125: ...125 Opening the casing door Troubleshooting Maintenance cont 5609 667 GB Service...
Страница 145: ...145 0017 0015 0012 0016 0013 0023 0022 0014 0024 Parts lists Electrical equipment type BWS cont 5609 667 GB Service...
Страница 183: ...183 5609 667 GB...