32
C
D
C
D
4.
2.
3.
2x
Example type AWB/AWB-AC 201.A04
C
Liquid line
D
Hot gas line
2.
!
Please note
Contamination (such as metal
swarf) or moisture must not
enter the copper pipes.
Therefore, hold the pipe open-
ings down or plug them.
Remove the nuts from connections
C
(liquid line) and
D
(hot gas line)
of the refrigerant lines.
Type AWB/AWB-AC 201.A04:
Slide the nuts onto the refrigerant
lines prepared on site.
Type AWB/AWB-AC 201.A07,
201.A10, 201.A13:
Replace nuts with union nuts sup-
plied (internal unit) (
⅝
UNF for liquid
line,
⅞
UNF for hot gas line).
3.
Swage the pipe ends.
4.
Secure the pipes.
Installation sequence
Connecting the refrigerant lines
(cont.)
5601 429 GB
Содержание 7424689
Страница 83: ...83 Opening the programming unit 1 3 2 2x Troubleshooting Repairs 5601 429 GB Service ...
Страница 84: ...84 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5601 429 GB ...
Страница 85: ...85 Placing the control panel in its service position 4x 2 3 1 Troubleshooting Repairs cont 5601 429 GB Service ...
Страница 86: ...86 Removing the separating plate 1 2 Troubleshooting Repairs cont 5601 429 GB ...