Installation & operation manual
15
victr on ener gy
B L U E P O W E R
Violet
Black
Red
Bus
GND
VBAT
4. Insert the labels in the cover.
Note:
•
Switch 1 and 4 are reserved for
the bilge-pump.
•
If necessary, make new labels
with the delivered CD.
•
Use an overhead sheet to print
the labels.
5. Connect the wires to the electronics.
6. Replace the front cover.