Installation & operation manual
10
victr on ener gy
B L U E P O W E R
Routing of the bus cable and main fuse box
max. 200 cm
80"
1. Lay-out the bus-, instrument-,
switchboard- and bilge-pump cables
and the main fuse box to where they
will be placed.
Note:
Make sure the main fuse box
is easy to access.
Warning!
Do not install nodes in a
petrol engine compartment or
a gas locker. There is a risk of
ignition and explosion.
Note:
Make sure that the cable between
the fuse box and the battery has a
maximum length of 200 cm (80”).
Warning!
If the +cable (red) between
the main fuse box and the
battery is longer than 200 cm
(80”), it needs a fuse of 80 A
at the battery.